86
TriScroll 300 Dry Scroll Vacuum Pump
D
R
A
FT
4/
29
/0
4
Put the Pump Back into Service
The TriScroll 300 pump can be placed into service immediately after maintenance is complete.
However, 24 hours of run time is required before base pressure of 10 mTorr can be achieved.
3. Install the cowling over the pump module.
4. Secure it with the three M5x16 screws.
This figure illustrates a fully reassembled
TriScroll 300 pump.
NOTE
The 24 hour run time does not have to
be continuous. If your application
requires a low base pressure, it is wise
to run the pump for the 24-hour period
for optimum performance.
Final Assembly (continued)
Содержание TriScroll 300 Series
Страница 4: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Страница 10: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Страница 12: ...2 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Maintenance Tool Kit ...
Страница 13: ...3 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Maintenance Tool Kit continued ...
Страница 16: ...6 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Tip Seal Tool Kit ...
Страница 74: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Страница 99: ......