manualshive.com logo in svg
background image

3

VL5LED WASH

QUICK START GUIDE

INSTALLATION

FLOOR MOUNTING THE LUMINAIRE

This luminaire included in this manual are designed to sit directly in a fl oor installation application. When used 
in this type of application, be sure to leave enough space around the luminaire to allow proper, uninterrupted 
airfl ow for cooling and movement.

HANGING THE LUMINAIRE

The VL5LED WASH can be hung horizontally or vertically from any structure 
designed to work with the type of load created by this moving luminaire. Two 
mounting truss hooks or other mounting hardware are required. Many compat-
ible truss hooks are available from diff erent manufacturers for your particular 
needs. A minimum of two hooks per luminaire is required. If mounting method 
does not use truss hooks, two attachment points, per luminaire, are required.

To install mounting hardware and brackets:

Step 1. 

Install truss hooks on two provided truss hook brackets as required as 
shown.

NOTE:  

Various types of truss hooks can be used. The Clamp (as shown) as well 

as many other standard hooks, can be ordered separately. 

Step 2. 

Determine required confi guration of bracket installation. Brackets may be installed in many diff erent 
orientations as shown in Figure 5.

Step 3. 

While pulling up on locking mechanism release, fi t keyed holes onto raised mounting buttons at bot-
tom of enclosure. Slide forward and release locking mechanism to lock in place. Ensure brackets are 
locked securely.

WARNING!

  Ensure that the bracket locking mechanism is fully seated after the bracket is installed on the 

luminaire.

Отзывы: