![Varec 2500 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/varec/2500/2500_installation-and-operation-manual_3495994041.webp)
Varec, Inc.
31
Figure 10:
Tape Clamp Assembly with Grounding Cable
4. Form a 'U' at the end of the perforated tape. Form it to match the 'U' piece previously
formed. Do not kink.
5. Install the gauge tape and 'U' piece to the tape connector with the tape clamps and screws
provided, making certain that the tape is not kinked or twisted.
6. Connect the grounding cable (A) to the tape connector (point B).
7. Attach the tape connector to the float.
8. Connect the grounding cable (A) to the float (point C).
Connecting the Cable to a Float in a Floatwell
Note
Ensure you have completed all previous steps from your installation checklist
before proceeding.
Note
On (internal or external) floating pan installations one end of the tape is connected
to a cable.
Float
Tape
Tape connector
Locking Tube
Clamp screw
2 required
Tape Clamp
2 required
Gauging Tape formed into "U"
Avoid bending at hole
6.00 Inch [155] piece of tape
formed into a "U"
Avoid bending at hole.
Grounding Cable
Float Grounding Clamp
3
Float
Tape
Cable
with ground connector
without ground connector
Cable Clamp
Tape Grounding Clamp
B
A
C
4
Содержание 2500
Страница 2: ......
Страница 6: ...vi Installation and Operations Manual...
Страница 10: ...2500 Automatic Tank Gauge 10 Installation and Operation Manual...
Страница 16: ...2500 Automatic Tank Gauge 6 Installation and Operations Manual...
Страница 66: ...2500 Automatic Tank Gauge 56 Installation and Operations Manual...
Страница 68: ...2500 Automatic Tank Gauge 58 Installation and Operations Manual...
Страница 108: ...2500 Automatic Tank Gauge 98 Installation and Operations Manual...
Страница 112: ...2500 Automatic Tank Gauge 102 Installation and Operations Manual...
Страница 118: ...2500 Automatic Tank Gauge 108 Installation and Operations Manual...
Страница 123: ......