Vantex AM505 Скачать руководство пользователя страница 11

Step 2

Install the rudder servo on the right position of servo 
tray in the fuselage. Attach the servo arm to the servo. 
Make sure the servo arm is perpendicular (90

°

) to the 

centerline of the fuselage when the servo is at the 
neutral position.

Step 3

Put the fuselage on its side with rudder virtually 
connecting. Using the provided rudder cable, measure 
a straight line from the rudder servo arm to the opening 
in Step 1, and mark the extension line on the rudder with 
a pen.

Step 4

Measure rearward 10mm (3/8”) from the edge of the 
rudder bevel and make another mark using a 
pen. The intersection of the line from Step 3 and 
this line will be the position for the rudder 
control horn.

Step 5

Carefully drill through the rudder at the marked position, 
perpendicular (90

°

) to the rudder centerline at the 

marked position. Be especially careful when penetrating 
through the backside of the rudder.

Step 6

Put the threaded rod of the rudder control horn through 
the hole and secure it with the provided nuts. Adjust the 
position of the rod so that it has the same length on both 
sides of the rudder. Screw the molded swivel link with 
linkage onto the threaded rod at the right position so
that the rudder cable in operation will not hit the opening 
of the fuselage.

Step 3

Carefully slide the remaining wing panel onto the wing tube that projects from the fuselage. The fit 
may be tight; use caution when inserting the wing panels onto the wing tube and fuselage.

Step 4

Make sure both wings fit well with the fuselage and 
there is no gap between them. Secure the wing 
panels using the provided wing screws.

Section 6 – Stabilizer Installation

12

9

Required Parts

• Stabilizer (left and right)
• Fuselage
• Stabilizer tube
 

Step 1 

Locate the opening for the elevator servo arm at the 
bottom of the stabilizer. Carefully remove the 
covering from the opening using a hobby knife.

Step 2

Install the elevator servo using the hardware 
provided with the servo as shown.

Содержание AM505

Страница 1: ...gine not incl 26 35cc Gas or 91 1 20 2C 1 10 1 40 4C Nitro Radio not incl 4ch 6 servos Construction Balsa and Plywood Features Designed for high performance scale aerobatics High quality balsa and plywood material Light weight and strong construction Foam brace on the back of fuselage Hidden switch hatch design Enhanced cowling mounting design Hardware package included Antenna tube included High q...

Страница 2: ...21 Table of Contents Appendix Parts and Options ...

Страница 3: ...ransitions smoothly from idle to full throttle and back Also ensure the engine is tuned according to the manufacturer s instructions and it will run consistently and constantly at full throttle when adjusted Check all the control horns servo horns and clevises to make sure they are secure and in good condition Replace any items that would be considered questionable Failure of any of these componen...

Страница 4: ...Sbach 300 AM50504 Rudder for 30cc Sbach 300 AM50505 Left Wing Panel w Aileron for 30cc Sbach 300 AM50506 Right Wing Panel w Aileron for 30cc Sbach 300 AM50512 Left Stabilizer w Elevator for 30cc Sbach 300 AM50513 Right Stabilizer w Elevator for 30cc Sbach 300 AM50516 Landing Gear for 30cc Sbach 300 AM50517 Wheel Pants for 30cc Sbach 300 AM50520 Wing Tube for 30cc Sbach 300 AM50521 Stabilizer Tube ...

Страница 5: ...Before Starting Assembly 18 3 Step 9 Install the switch for the ignition in the switch hatch on the side of the fuselage as shown Note As the cowling mounting screw is inside the fuselage under the hatch you need to open the hatch before accessing the screw To open the hatch just remove the screws holding it on both sides of the fuselage and lift the hatch from the fuselage Step 10 Secure the batt...

Страница 6: ...e servo is at the neutral position Step 6 Repeat Steps 1 through 5 for the remaining wing panel Section 1 Aileron Servo Installation Step 2 The vertical and horizontal base lines are pre marked on the firewall Measure and mark the same distance from the lines for the four engine standoff screws The firewall is already mounted correctly to provide right offset for the engine when the engine standof...

Страница 7: ... the sheeting you will be drilling through this Make sure to drill the hole perpendicular to the centerline of the aileron Step 2 Wrap the receiver battery in foam and use rubber bands or hook and loop straps to secure the battery to the battery tray Step 3 Assemble the fuel tank correctly Be sure to use the gas compatible stopper and fuel tubing Step 4 Place foam on the floor of the tank compartm...

Страница 8: ... until the hinge pin center is flush with the leading edge of the aileron Wipe away any excess epoxy with rubbing alcohol Continue installing hinges in the leading edge of the aileron The control surfaces ailerons will be installed after the epoxy is fully cured Note Be sure that the hinge pivot pins are parallel and flush to the aileron leading edge It s important to frequently mix a fresh batch ...

Страница 9: ... epoxy to fully cure for enough time Now is a good time to repeat Steps 1 through 5 for the remaining wing panel and aileron Step 7 When fully cured move each control surface throughout its travel range several times to break away any epoxy in the hinge Be sure to deflect the surface fully Note It s a good idea to seal the aileron and elevator hinge lines airtight with a piece of covering to preve...

Страница 10: ...eck the opening for the wing tube servo leads and pins from inside of the fuselage where the wing panels connect to the fuselage Carefully remove the covering from the opening using a hobby knife Step 2 Locate the wing tube and carefully slide it into one wing panel as deeply as possible Slide the wing with tube into the wing tube opening in the fuselage Pass the servo lead in the wing into the fu...

Страница 11: ...de of the rudder Step 6 Put the threaded rod of the rudder control horn through the hole and secure it with the provided nuts Adjust the position of the rod so that it has the same length on both sides of the rudder Screw the molded swivel link with linkage onto the threaded rod at the right position so that the rudder cable in operation will not hit the opening of the fuselage Step 3 Carefully sl...

Страница 12: ...tabilizer using the same techniques for the wing installation Secure the stabilizer with screws at the bottom as shown Step 3 Center the elevator servo using the radio system Install a servo arm onto the servo Note The technique for installing the control horns in the elevators is similar to the aileron control horn installation Step 4 Mark a line 3mm 1 8 away from the servo arm and parallel to th...

Отзывы: