background image

STONEVAC AM

120V

25799 Jefferson Ave.

  

  

Murrieta, CA 92562

  

  

1-800-VANIMAN (826-4626) 

 

www.vaniman.com  

 [email protected]

SV-AM-07/23 Page 1

PACKING LIST

 

 

1 - StoneVac for Additive Manufacturing

 

1 - Plastic Disposal Bag

 

1 - Power Cord

 

1 - Interface Cable

 

1 - Large Accumulator

 

1 - 2.5" x 6’ Hose

INSTRUCTIONS

1.  Remove the unit and other parts from the box and check against the packing list. Remove the hose 

and power cord from inside the dust bin as well as any protective paper packing material.

2.  Plug one end of the power cord into the back of the StoneVac and the other end into a designated 

15 AMP circuit. Turn on the StoneVac by flipping the main power switch on the back of the Unit into 

the 

ON

 position. Once the switch is in the 

ON

 position, the red LED indicator on the front of the unit 

will illuminate.

3.  The 2.5" vacuum hose supplied slips onto the vacuum connection in the back of the unit and the 

other end connects to the top of the Large Accumulator. The 1.5" vacuum hose connects from the 

Large Accumulator's inlet arm to the collection point in your post-processing area. The ideal location 

for the StoneVac is near the post-processing area. Hose extensions and adaptors are available from 

your dealer. We recommend, however, that you try to keep the total length of hose less than 6 feet 

between the StoneVac and the dust collection point; longer hose will reduce suction.  

IMPORTANT SERVICE INFORMATION:

SAVE SHIPPING BOX AND FOAM FOR FUTURE 

SERVICE.  SHIPPING WITHOUT PROPER FOAM 

MAY CAUSE DAMAGE TO UNIT

Fig. 1

Отзывы: