Vanguard Instruments VBT-75 S2 Скачать руководство пользователя страница 13

VBT-75 S2 USER’S MANUAL  REV 1 

 

 

 

 

10 

 

e.

 

The following summary screen will be displayed: 

 

If you need to make changes, turn the 

[CONTROL KNOB]

 either clock-wise or 

counter-clockwise and you will be returned to step b.  

If the test parameters are correct, press the 

[CONTROL KNOB]

f.

 

The following screen will be displayed: 

 

Press the red 

[PUSH TO "ARM"]

 switch. 

g.

 

The VBT-75 S2 will initiate the test and start the timer based on the test duration 
selected. The screen will be updated with the test voltage and the leakage current as 
shown below: 

 

h.

 

After the test time duration has elapsed, the test results will be displayed. If the leakage 
current did not pass the preset value set in step d, the test voltage is returned to zero 
and a "PASS" message is displayed as shown below: 

 

However, if a flash-over condition occurred, such as bottle failure, the test voltage is 
immediately turned off and a "FAIL" message is displayed as shown below: 

 

 

The "TEST FAIL" LED on the front panel will also be illuminated to indicate a test failure.   

Press the 

[CONTROL KNOB]

 to return to the "START-UP" menu. 

 

 

TEST COMPLETE 

 

>>>FAIL<< 

 

TEST COMPLETE 

 

>>>PASS<< 

 

TEST IN PROGRESS 

  55KV     59.31

 μ

Time: 00:04 

 

  PRESS RED SWITCH 
 
   TO START TEST 

 

  TEST PARAMETERS 
75KV   5Sec  300

 μ

 
  "PRESS" IF OKAY 

Содержание VBT-75 S2

Страница 1: ...VBT 75 S2 VACUUM BOTTLE TESTER USER S MANUAL Vanguard Instruments Company Inc 1520 S Hellman Ave Ontario California 91761 USA TEL 909 923 9390 FAX 909 923 9391 July 7 2017 Revision 1...

Страница 2: ...el or by an authorized repair service provider Unauthorized modifications can cause safety hazards and will void the manufacturer s warranty EQUIPMENT RATINGS IP Rating The enclosure for the VBT 75 S2...

Страница 3: ...cators 4 2 0 CABLE CONNECTIONS 6 3 0 OPERATING PROCEDURES 7 3 1 Set the Date and Time 7 3 2 Changing the LCD Screen Contrast 8 3 3 Performing a Test 9 3 4 Updating Firmware 11 LIST OF TABLES Table 1 V...

Страница 4: ...ST SETUP CABLE VT USER S MAN CONVENT the followin on the VBT 7 u names are creen output ected item o es are indica arning mess are indicate te details 07 06 11 03 G 0V UAL TIONS US ng conventio 75 S2...

Страница 5: ...f 100 A 200 A or 300 A the test voltage is returned to zero and a Pass message is displayed If a flash over condition occurs such as bottle failure the test voltage is immediately turned off a Failure...

Страница 6: ...urn cable on Shipping case i One year on pa ications are 25 C 77 F 2 Technical S vacuum bottle 7 W x 10 5 H x 4 53 Kg 2A 50 60 Hz dc in 5 kV steps harge time for i 20 characters x ght sunlight an d pr...

Страница 7: ...unctional description in Table 2 The table describes the function of each item on the control panel The purpose of the controls and indicators may seem obvious but users should become familiar with th...

Страница 8: ...ac 2A 50 60 Hz F3AL 250V Input power connector with built in fuse holder and power switch 5 GROUND VBT ground stud Connect ground stud to substation ground using the provided cable 6 TEST FAILED Test...

Страница 9: ...typical BT 75 S2 aga s ground stu er must be o e under test ure 2 VBT 75 foot 3 05m ated with al cable conne inst static di ud to the sub off line and c t should be i 5 S2 Connect VBT 75 m high volta...

Страница 10: ...ess the CONTROL KNOB c The following screen will be displayed Turn the CONTROL KNOB to select the first digit of the month and then press the CONTROL KNOB The cursor will move over to the second digit...

Страница 11: ...NOB until the LCD CONT option is enclosed in brackets as shown below Press the CONTROL KNOB c The following screen will be displayed Turn the CONTROL KNOB clock wise or counter clockwise to adjust the...

Страница 12: ...following screen will be displayed Turn the CONTROL KNOB clock wise or counter clockwise to increase or decrease the test voltage by 5 KV increments respectively 10 KV to 75 KV When the desired test v...

Страница 13: ...ent as shown below h After the test time duration has elapsed the test results will be displayed If the leakage current did not pass the preset value set in step d the test voltage is returned to zero...

Страница 14: ...ll need to be approved first before it can be used to download any software or firmware This is usually done within 30 minutes of creating your account b After logging in to your account hover your mo...

Страница 15: ...r ommend us ed off insert CONTROL rough the ini ss The STA ot folder of ty flash drive rom the driv ing a flash d t the USB Fla L KNOB t itial starting RT UP men VBT 75 a USB Flash e Please bac ve riv...

Страница 16: ...S Hellman Ave Ontario CA 91761 USA Phone 909 923 9390 Fax 909 923 9391 www vanguard instruments com Copyright 2017 by Vanguard Instruments Company Inc VBT 75 S2 User s Manual Revision 1 0 July 27 201...

Отзывы: