background image

     

ATO-

250™ Operating Procedures 

 

 

4.0 Furnished Test Accessories  

The ATO-250

 is supplied with a canvas 

bag, a power cord, a roll of 2.5-inch-wide 
printer paper and one set of 35-foot test 
cable with heavy-duty alligator clamps. 
Optional heavy-duty, welding-type C-
clamps are also available instead of alligator 
clamps. 

A heavy duty shipping case is available as 
an accessory. 
 

5.0 ATO-250 Specifications 

(Refer to the specification list in Table 1.0) 
ATO-250 specifications and leading 
particulars are listed in Table 1.0.

 

 

Table 1.0  ATO-250 Specifications and Leading Particulars 

 
MODEL 

ATO-250 (part number VIC-25000-S2) 

 

TYPE 

 

Special-purpose test equipment, portable, 250 Amperes 

 

 

digital micro-ohm meter 

 
POWER 

85 to 132 Vac or 200-240 Vac (selectable), 50/60 Hz  

 
SIZE

 (inches)

 

16.8 wide by 12.6 high by 10.6 deep

 

 
WEIGHT 

Less than 42 lbs 

 

TEST CURRENT

 

10 to 250 amperes 

 

READING RANGE

 

1 micro-ohm to 300 milliohms

 

 
ACCURACY

 

1% reading, 

 1 count 

 

DISPLAY

 

LCD

4-line by 20-character, backlit 

 

CONTROLS

 

Keypad: 10 number keys and 6 function keys 

 
COMPUTER INTERFACE

 

RS-232C  

 

PRINTER

 

Thermal printer (prints on 2.5 inch-wide thermal paper)

 

 

ENVIRONMENT

 

Operating: 0

C to 55

C; Storage: -40

C to 65

 

FURNISHED

 

One power cord, one set of 35-foot test cable,  

 

One canvas bag 

 
EXPENDABLES

 

Paper, thermally sensitive, 2.5 inch wide roll

 

  

(VIC part # TP-3) 

 
WARRANTY

  

One-year warranty on parts and labor;  

 

 

Post warranty service contracts available

 

 

NOTE:  
▪THE ABOVE SPECIFICATIONS ARE VALID AT NOMINAL OPERATING VOLTAGE AND AT A TEMPERATURE OF 25

(77

F) 

▪ATO-250 SPECIFICATIONS MAY BE UPGRADED AND CHANGED WITHOUT PRIOR NOTICE. 

Содержание II Series

Страница 1: ...S for the MODEL ATO 250 10 250 Amperes Digital Micro Ohm Meter Series II ID Number VIC 25000 S2 Vanguard Instruments Company 1710 Grevillea Court Ontario California 91761 TEL 909 923 9390 JULY 2001 FA...

Страница 2: ...isk of introducing additional or unknown hazards To ensure that all designed safety features are maintained it is recommended that repairs be performed only by Vanguard Instruments Company factory per...

Страница 3: ...s 2 6 0 Controls and Indicators 3 7 0 Preset Setup 5 8 0 ATO 250 Printer Paper 6 9 0 ATO 250 Cable Connections 6 10 0 Operating Procedures 8 11 0 Run Test Procedure 8 12 0 Enter Test Information Proce...

Страница 4: ...5 Figure 4 0 ATO 250 Cable Connection 6 Figure 5 0 Step by Step Operating Procedures 7 Figure 6 0 Typical ATO 250 Test Report 11 Figure 7 0 Typical Test Record Directory Print Out 15 Figure 8 0 Bus Ba...

Страница 5: ...ows based software package is supplied with each ATO 250 that allows the user to retrieve test records stored in the unit s memory Operation requires little more than connecting the test leads to an u...

Страница 6: ...hm meter POWER 85 to 132 Vac or 200 240 Vac selectable 50 60 Hz SIZE inches 16 8 wide by 12 6 high by 10 6 deep WEIGHT Less than 42 lbs TEST CURRENT 10 to 250 amperes READING RANGE 1 micro ohm to 300...

Страница 7: ...mber is cross referenced to a functional description in Table 2 0 Although the purpose of these controls and the display may seem obvious and intuitive users should become familiar with them before at...

Страница 8: ...el from 10 to 250 Amperes 7 None 4 line by 20 character backlit LCD screen Use for displaying menu selections prompts and test result data 8 None Keypad consisting of momentary contact pushbuttons Ten...

Страница 9: ...ction is set by jumpers on a terminal block as shown in Table 3 0 and in Figures 2 0 and 3 0 Table 3 0 Input Power Voltage Selections VOLTAGE SELECTION TERMINAL BLOCK JUMPERS 90 130 Vac Brown to Blue...

Страница 10: ...nt Co 13607 E Trent Avenue Spokane WA 99216 Tel 509 893 9881 Fax 509 893 9803 Part Number TP 3 paper 9 0 ATO 250 Cable Connections The ATO 250 is supplied with a set of 35 foot test cable Each cable c...

Страница 11: ...ATO 250 Operating Procedures 7 Figure 5 0 Step by Step Operating Procedures...

Страница 12: ...setup for 240 volt operation plug the power cable into a 240 volt outlet receptacle b Insert the test current cable plugs and the test voltage sensing cable plugs into the respective control panel ja...

Страница 13: ...Figure 6 After the test result is printed the KEEP THIS READING prompt will appear If a printout of the test record is not needed then press the number two key NO in which case the following prompt i...

Страница 14: ...TEST then the SAVE THIS RECORD display is shown next o To save the record into the FLASH EEPROM select the number one key YES The ATO 250 will assign a record number automatically as shown below p Th...

Страница 15: ...key once to select the number 2 Press the key a second time to select the letter A If the key is pressed a third time letter B will be selected While the fourth time will select the letter C Pressing...

Страница 16: ...ers for the SERIAL NUMBER Then press the ENTER key The KVA RATING prompt will display i Press the characters of the KVA RATING Then press the ENTER key The OPERATOR ID prompt appears next j Place the...

Страница 17: ...ich will printout the test record and return to the START UP menu h When the list scrolls to the record of interest shown on the above display press the ENTER to display the date and time of the test...

Страница 18: ...ER CONTROL to allow the ATO 250 to be controlled by an IBM compatible personal computer The computer interface ITF mode advisory will display d To end the Computer Interface mode press the STOP key at...

Страница 19: ...printout the display returns to the START UP menu A typical test record directory print out is shown in Figure 7 0 Figure 7 0 Typical Test Record Directory Print Out 16 0 Erase Record Procedure The fo...

Страница 20: ...allows the user to verify the electronics of the ATO 250 is working properly All of the procedures start at the START UP menu shown below a Press the number three key to begin the CAL CHECK procedure...

Страница 21: ...s the following test results will display in rapid succession f Press the ENTER key to return the display to the START UP menu This completes the CAL CHECK procedure Figure 8 0 Bus Bar Connection ZERO...

Страница 22: ...urrent teeth are touching the device under test DUT 2 Inspect sensing cables 2 No Test Current Current reads zero and resistance reading is also zero 1 No test current going through the DUT 2 Drive ci...

Страница 23: ...Operating Procedures 19 APPENDIX B ATO 250 Cable Accessories Plastic Quick Disconnect Clip C Clamp Current Connector and Sensing Wire Connector C Clamp Plastic Clip Current Connector Sensing wire Con...

Страница 24: ...ATO 250 Operating Procedures 1710 Grevillea Court Ontario CA 91761 USA Phone 909 923 9390 Fax 909 923 9391 Website http www vanguard instruments com ATO 250 11 05 01 OAK...

Отзывы: