Operating Procedures
EZCT and EZCT-10
12
5.0 EZCT CABLE CONNECTIONS
Always connect the EZCT to the substation ground before connecting any test cables.
The EZCT is supplied with a 20-foot X test cable and a 35-foot H cable. Only the X cable
connection is required to run the current transformer excitation test. The H and X cable
connection is required to run the transformer ratio test. A typical connection is shown in figure 3.
Figure 3 Typical EZCT Cable Connection
Содержание EZCT
Страница 2: ......
Страница 4: ......
Страница 18: ...Operating Procedures EZCT and EZCT 10 14 Figure 6 Typical EZCT Connection to Multiple CTs...
Страница 24: ...Operating Procedures E Z C T a n dE Z C T 1 0 20 Figure 8 Typical EZCT Excitation Graph Knee Point Marker...
Страница 31: ...Operating Procedures E Z C T a n dE Z C T 1 0 27 Figure 10 Test Record ID Directory Printout...
Страница 38: ...Operating Procedures E Z C T a n dE Z C T 1 0 34 Figure 13 Typical Test Record Directory Printout...
Страница 44: ...Operating Procedures E Z C T a n dE Z C T 1 0 40 Figure 14 Tabulated Report with Impedance Print Out...