INSTALLING THE DRYER

SECTION 4

4.1  LOCATION

WARNING

DO NOT INSTALL THIS DRYER IN AN ENVIRONMENT OF
CORROSIVE CHEMICALS, EXPLOSIVE GASSES, POISONOUS
GASSES, OR SATURATED STEAM HEAT.

Locate dryer in a protected, well vented area where ambient
temperatures are between 40

o

F and 120

o

F.  If this dryer must be

installed where ambient temperatures are below 40

o

F, insulation and

heat tracing must be properly installed on the inlet piping, purge exhaust
line and the desiccant towers to prevent freezing of the equipment.

Position the dryer in the upright position on a solid, level, vibration free
surface capable of supporting the dryer’s weight.  Allow sufficient
clearance over and around the dryer.  

Refer to SECTION 3.2 for dryer

dimensions.

The dryer should not be located in extremely dirty areas where airborne
contaminants can accumulate on the dryer.  If this cannot be prevented,
the dryer should be cleaned periodically.

4.2 PIPING AND ANCILLARY EQUIPMENT

IMPORTANT

Make sure that the inlet air piping is connected to the bottom and the
outlet air piping is connected to the top of the dryer.

Make sure that the inlet and outlet piping to and from the dryer is
properly supported.  Excessive stress may cause damage and/or
dryer malfunction.

Remove protective caps or covers from all valves before installing this
dryer.

If this dryer is to be installed into an existing piping system, clean the
existing inlet piping to remove all accumulated dirt, pipe scale, etc.,
before connecting the dryer.  Make sure that the inlet and outlet shutoff
valves are tightly closed before connecting to the existing piping system.

When installing the piping and any additional components, make sure
that adequate pipe supports are used.  Excessive stress on the dryer
and components may cause damage or premature failure.  Use either
overhead or stiff-leg type supports.

Make sure that the piping is correctly connected to the dryer.  The inlet
is the bottom connection and the outlet is the top connection.

Reference SECTION 3.2 for dryer dimensions and connection
locations.

Once the location has been determined, place the dryer into position.

Reference SECTION 1 for handling instructions.

4.2-1 BYPASS PIPING (optional)

The installation of bypass piping is not required, but will allow the
dryer and filter(s) to be taken off stream without interrupting the air
system.

In Figure 4A, a recommended bypass piping layout and additional
components are shown.  Basic bypass piping should include an inlet
isolation valve, a bypass valve, and an outlet isolation valve.  The
isolation and bypass valves must be bubble-tight.

4.2-2 FILTERS

CAUTION

A PROPERLY RATED COALESCING PREFILTER MUST BE
INSTALLED BEFORE THE DRYER TO REMOVE LUBRICATING
OILS, DUST AND PIPE SCALE CONTAMINATION.  FAILURE TO
USE A PREFILTER WILL RESULT IN DAMAGE TO THE DRYER
AND VOIDS THE WARRANTY.

Make sure that the elements are installed in all filter housings
prior to start up.

4.3 REMOTE PURGE EXHAUST PIPING

To reduce the noise during purging and tower depressurization, this
dryer was supplied with a muffler for installation on the purge exhaust
valve.  If the sound or humidity discharged from this dryer is unaccept-
able, the purge of this dryer can be piped remotely away.

IMPORTANT

Make sure that the piping is as short as possible and does not
create back pressure on the dryer.  To prevent liquid accumula-
tion in the piping and purge valve, the piping must be at the
same level or lower than the purge valve.

The purge line must be vented to atmospheric pressure.  If the
ambient temperature at the venting end of the piping is subject
to temperatures below 32

o

F, freeze protection must be installed.

The purge valve has threaded pipe connections.  Reference Section
3.2 for location.  Use adequate pipe supports on the piping to prevent
stress on the valve.

The distance will determine the size of piping that is recommended.
For distances of 10 feet or less, use piping of the same size as the
purge valve.  For distances up to 20 feet, use piping one size larger
than the purge valve.

A coalescing prefilter must be installed before the dryer to remove
lubricating oils, dust and pipe scale contamination.  It is
recommended that a high efficiency coalescing filter with an
automatic drain or electric drain valve be installed.  The filter should
be equipped with a pressure differential indicator to monitor the
condition of the element.

A particulate afterfilter should be installed downstream of the dryer.
The afterfilter will remove any desiccant dust.  The afterfilter should
be equipped with a pressure differential indicator to monitor the
condition of the element.

Make sure that the filters are properly installed according to the
instructions provided with them.

4.5 INSTALLING THE PURGE MUFFLER

To reduce the sound level during purge and tower depressurization,
this dryer was supplied with a muffler for installation on the purge
exhaust valve.  For muffler location 

Reference SECTION 3.2.

4.4 INSTALLING PRESSURE RELIEF VALVES

CAUTION

THESE VESSELS MUST BE PROTECTED BY PRESSURE RELIEF
VALVES.  Refer to OSHA 1910.169 Par. b, Sub. Par (3) and ASME
Boiler and Pressure Vessel Code, Section VIII, Division 1, UG-125
through UG-136.  Also check government regulations, i.e., state
and local codes.

Relief valve connection ports were NOT provided on this dryer.  It is
recommended that relief valves be installed to comply with all
applicable codes.  The relief valves should be full flow type, rated for
the dryer operating conditions.  For recommended location see Figure
4A.

The muffler was shipped separately. It should 

NOT 

be installed until

the dryer has been operated for several hours.  From desiccant
installation, some dust may be present in the desiccant towers.
Operating the dryer with the muffler installed immediately after the
towers have been filled with desiccant or at initial start up may cause
the muffler to clog.

IMPORTANT

The dryer must be operated for several hours without the
muffler after the towers have been filled with desiccant.  This
will prevent the muffler from becoming clogged.

Содержание HLS-120

Страница 1: ...PERSONAL INJURY DO NOT REMOVE REPAIR OR REPLACE ANY ITEM ON THIS DRYER WHILE IT IS UNDER PRESSURE NEVER OPERATE THIS DRYER ABOVE THE RATED OPERATING CONDITIONS OPERATION ABOVE SPECI FIED CONDITIONS WI...

Страница 2: ...INJURY AND OR EQUIPMENT DAMAGE MAY RESULT MAKE SURE THAT ALL EQUIPMENT BEING USED TO LIFT THE DRYER IS CAPABLE OF LIFTING THE WEIGHT OF THE DRYER IF THE DRYER IS TO BE TRANSPORTED OVERHEAD MAKE SURE T...

Страница 3: ...S 80 HLS 120 HLS 150 ELECTRICAL Nema 4 Electrical enclosure Standard 115V 115V 1PH 50 60Hz Optional 230V 230V 1PH 50 60Hz DESICCANT Material Activated Alumina 1 8 2 5 MM Bead type Quantity Per Tower L...

Страница 4: ...to start up 4 3 REMOTE PURGE EXHAUST PIPING To reduce the noise during purging and tower depressurization this dryer was supplied with a muffler for installation on the purge exhaust valve If the soun...

Страница 5: ...RSONAL INJURY AND DAMAGE TO THE DRYER WILL OCCUR IF THE DRYER IS CONNECTED TO A POWER SOURCE OTHER THAN THE VOLTAGE LISTED ON THE DATA TAG WHEN INSTALLING THE ELECTRICAL CONNECTIONS FOR THIS DRYER COM...

Страница 6: ...d the purge air which was vented to atomosphere earlier in the cycle is now used to repressurize the regenerated tower FIGURE 6A PNEUMATIC SCHEMATIC 6 1 2 CHANGEOVER DEPRESSURIZATION STAGE Tower chang...

Страница 7: ...ressurize both towers of the dryer until there is demand on the compressor The Hold LED will light if the dryer is wired as described and the compressor is not running IMPORTANT Operating this dryer o...

Страница 8: ...ING THE DUST AND PROLONGED CONTACT WITH THE SKIN FIRST AID IN CASE OF EYE CONTACT IMMEDIATELY FLUSH EYES WITH PLENTY OF WATER FOR AT LEAST 15 MINUTES CONSULT A PHYSICIAN Take dryer off stream followin...

Страница 9: ...ions correct them and condition the bed following the procedures in Section 5 3 ARE THE BYPASS VALVES OPEN OR LEAKING Check the valves if installed Repair or replace if faulty IS THE POWER ON AND RUN...

Страница 10: ...ntrol Air Filter Element control air filter Desiccant Activated Alumina 1 8 dia 25 pail Control Box complete Circuit Board only Membrane Panel Pressure Switch HLS 55 115V PART NO 14 2073 26 6516 26 65...

Страница 11: ...rol Air Filter Element control air filter Desiccant Activated Alumina 1 8 dia 25 pail Control Box complete Circuit Board only Membrane Panel Pressure Switch HLS 120 115V PART NO 14 2075 26 6515 26 651...

Страница 12: ...FROM IMPROPER GROUNDING CAN CAUSE INJURY OR DEATH GROUND UNIT AND RELATED EQUIPMENT ACCORDING TO NATIONAL ELECTRICAL CODE AND LOCAL REGULATIONS WARNING WARNING READ THE OPERATOR S MANUAL BEFORE START...

Отзывы: