www.valtir.com
12
Revision F November 2022
Figure 3
5) Trace its circumference
As each barrel is placed in its proper location, trace its circumference onto the
pavement, then remove the barrel to allow for the next step.
6) Marking the location
Mark the location of each module and its model number or weight. This helps to properly
position the array and aids during maintenance and refurbishment when modules need
to be replaced (See Figure 4).
Figure 4
7) Moving barrels into position
After the location of each module is marked on the pavement, place the barrels back into
their proper positions. Move the barrels into position one row at a time while they are
empty (See Figure 5).
When Energite
®
III/Fitch
®
Universal Module Systems modules are placed on slopes or
vibrating surfaces, the modules may be held into place on:
•
Concrete by two expansion bolts through holes, 180 degrees apart in the bottom.
•
Asphalt by four galvanized nails driven through the bottom, 90 degrees apart, 75 mm
(3”) from the outside wall of the barrel with full penetration.
Содержание ENERGITE III
Страница 1: ......
Страница 22: ...www valtir com 21 Revision F November 2022 Notes...
Страница 23: ...www valtir com 22 Revision F November 2022 Notes...
Страница 24: ......