background image

Page 13 

Arden Stove 

INSTALLATION 

Final Check 

 

Before handing over the installation to the customer  
it is a requirement under Document J that the  
appliance is lit,  and the functioning of the chimney 
system is checked for satisfactory operation. 

 

• 

Be sure that the chimney is operating and 
that ALL the smoke and fumes are vented to 
the atmosphere through the chimney  

 terminal 
 

• 

Check all joints and seals 

 

• 

Clean the outside of the appliance to       
prevent any stains becoming burnt on. 

 

• 

Check the flue draught which should read   
1 - 2mm H

2

o / 0.1 - 0.2mbar 

 

• 

If Building Control Consent route is being 
sought please complete the check list on 
page 14. 

 

• 

For Registered Competent persons Scheme 
such as HETAS, please complete the      
Certificate of Compliance, which is used for 
checking and reporting the installation as 
imposed by the government  

 

• 

Explain the controls and operation of the 
appliance to the customer 

 

 
Checklist 

 

The following details 

must

 be checked and  

completed in full by the installer at the time of  
installation. Please answer all the questions on the  

Checklist 

( page 14 ) as 

fully

 as possible. 

Valor

 can 

not be held responsible for chimney or installation 
problems or faults 

Содержание The Arden

Страница 1: ...Operating Installation Manual Arden Stove BK018 EN 13240 2001 Rev 07 February 2008 Parts No AFS1080 07 PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE...

Страница 2: ...tas co uk THIS STOVE MUST NOT BE CONNECTED TO A SHARED FLUE SYSTEM TO ALL USERS PETROLEUM COKE SOME OF WHOSE BRAND NAMES ARE CALCO PETROCOKE AND WONDERCO MUST NOT BE BURNED IN THIS APPLIANCE BITUMINOU...

Страница 3: ...erminals 9 Flues Chimneys 9 12 Final Check 13 Building Control consent Checklist 14 Servicing Maintenance Annual Maintenance 15 Cleaning 15 Chimney Sweeping 15 Door Glass 15 Outer Finish 15 Summer sto...

Страница 4: ...e best materials and the most modern equipment available It is a highly efficient and sophisticated piece of machinery and when properly installed and operated it should provide a lifetime of heating...

Страница 5: ...l Aid not to scale Quantity 1 Fuel grate 1 2 Feet Fixings 4 3 Throat Plate 1 4 Flue Spigot 1 4 5 Hot Plate 1 4 6 Ash Pan 1 7 Operating Tool 1 8 Rear Liner 1 9 Side Liners 2 10 Instructions 1 Inside th...

Страница 6: ...n Flue Gas Temperature c 267 Mean Co Emission 13 O2 0 59 Flue Mass Gas Flow g s 3 2 Minimum Distance to Combustible Material mm Rear 700 Side 500 Height mm 540 Width mm 405 Depth mm 362 Height to cent...

Страница 7: ...e not damaged during installation Hearth The stove shall be installed on a floor with adequate load bearing capacity If the existing construction does not meet this prerequisite suitable measures eg l...

Страница 8: ...el bars or grate Set the small liner into the back of the stove Insert side liner panels into each side of the stove Fit the throat plate with the single bend and two cut outs to the front facing up T...

Страница 9: ...made aware of this Failure to correct an over drawing flue will invalidate the warranty Please remember that chimney draught is dependent on four main factors Flue gas temperature Flue height Flue si...

Страница 10: ...providing a Notice Plate giving details on the chimney flue lining hearth and fireplace installation Approved Docu ment J of the Building Regulations for England Wales is available from The Stationary...

Страница 11: ...iance be connected to a shared flue system that serves any other heating appliance TYPICAL REAR FLUE OUTLET as per BS 8303 1 Maximum 150mm 6 Horizontal Flue Section Minimum 150mm 6 Diameter Flue Soot...

Страница 12: ...iew Of Steel Register Plate 1 5mm Thick Minimum TYPICAL TOP FLUE OUTLET as per BS 8303 1 Typical Metal Insulated Chimney System To Be Installed To The Chimney Manufactures instructions in compliance W...

Страница 13: ...the flue draught which should read 1 2mm H2o 0 1 0 2mbar If Building Control Consent route is being sought please complete the check list on page 14 For Registered Competent persons Scheme such as HET...

Страница 14: ...Building regulations Print name and title Profession Capacity Telephone No Address Postcode Signed Date Registered member of e g CORGI OFTEC HETAS NACE NACS 7 Hearth Form of construction new or exist...

Страница 15: ...ust be swept at least twice per burning season It is important that the flue ways flue pipe and chimney be cleaned prior to lighting the fire after a prolonged shut down period Door Glass The door gla...

Страница 16: ...are well lubricated for the summer months during periods of prolonged non use If possible store the throat plate outside of the stove check all moveable components at regular intervals to ensure they...

Страница 17: ...ew the two nuts on the inside of the door securing the retaining clips Carefully remove any pieces of broken glass and sealing gasket wearing suitable gloves Refit New Gasket The fitting of new gasket...

Страница 18: ...lat surface with the rear face upwards Carefully remove old rope gasket and old adhesive Take note of the layout of the rope seal ensure no traces of old adhesive rust or flakey paint are present as t...

Страница 19: ...age will occur WARNING NEVER BURN PLASTICS OR HOUSEHOLD WASTE IN YOUR STOVE WARNING NEVER BURN LIQUID FUELS IN YOUR STOVE PLEASE CONTACT The Manufacturer For Further Details Advice On The Use Of Other...

Страница 20: ...re and tar which will create condensation and deposits in the chimney This effect can be minimised by burning hard for a short period 15 to 20 minutes twice a day Please Note To avoid chimney problems...

Страница 21: ...ove the ash pan See Fig 9 Fit the fork end of the tool into the two slots in the ash pan rear face ensure the forks are fully engaged to prevent an accident from occurring AIR INLET CONTROLS The Arden...

Страница 22: ...te AFS1078 2 Feet Fixings AFS1079 3 Throat plate AFS1074 4 Flue spigot AFS009A 5 Hot plate AFGS064 6 Ash pan AFS058 7 Operating tool AFS008 8 Rear Liners AFS1069 9 Side Liners AFS1068 10 Instructions...

Страница 23: ...periods commence on the date of purchase and are non transferable Our guarantee is offered as an addition to your statutory rights The guarantee is applicable to the original purchaser only and is non...

Страница 24: ...Flue Outlet Hot Plate Grate Firebox Liners Throat Plate Air Wash Door Catches Feet Fixings Ash Pan Operating Tool Operating Installation Manual Assembled By Checked by Baxi Fires Division Wood Lane E...

Отзывы: