Valor 796 Скачать руководство пользователя страница 2

Page 2 of 5

 

 
4.  INSTALLATION 

 

 

Remove the heater inner front and front frame 

in sequence and set aside. ( refer to fireplace 

installation instructions)

 

 

 

Remove the window, log set and brick set.

 

     (refer to fireplace installation instructions)

 

 

 

Shut off gas supply to the fireplace and 

disconnect the gas line.

 

 

 

Remove five screws securing the burner/ 

control  assembly. The complete burner 

assembly can now be withdrawn from the 

 

      fireplace by pulling it forward. (Fig. 1)    

                                        

 

 

NOTE: 

Ensure that the metal base of the gas 

fireplace

 

enclosure is supported and anchored 

to the floor (or bottom of masonry firebox). 

If the metal base can flex up and

 

down, it may  

be a source of vibration noise when the 

blower unit is installed. 

Now is the time to  

correct this. 

 

 

Fit the blower unit by placing it into the rear 

of the insert box and engage the back edge of 

the mount into the raised cleats on the floor 

of the box. Fasten the front of the mount to 

the bracket using the machine screw 

provided.(fig.2)                                                                               

 

 

 

Fit the right hand and left hand heat baffles to 

the sides of the liner box using the screws

 

provided. (Fig.3) 

 

 

 

 

Route the wiring harness to the left side of  

      the liner box, through the cutout in the left 

     hand heat baffle, and fasten to the side wall                    

using the cable tie and the lower baffle securing 

screw. (fig.4) 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

fig. 1

 

 

fig.2

 

fig.3

 

 

fig.4

                                                                                    

f i r e - p a r t s . c o m

Отзывы: