![Valor 796 Скачать руководство пользователя страница 2](http://html2.mh-extra.com/html/valor/796/796_installation-and-operating-instructions_3272722002.webp)
Page 2 of 5
4. INSTALLATION
•
Remove the heater inner front and front frame
in sequence and set aside. ( refer to fireplace
installation instructions)
•
Remove the window, log set and brick set.
(refer to fireplace installation instructions)
•
Shut off gas supply to the fireplace and
disconnect the gas line.
•
Remove five screws securing the burner/
control assembly. The complete burner
assembly can now be withdrawn from the
fireplace by pulling it forward. (Fig. 1)
NOTE:
Ensure that the metal base of the gas
fireplace
enclosure is supported and anchored
to the floor (or bottom of masonry firebox).
If the metal base can flex up and
down, it may
be a source of vibration noise when the
blower unit is installed.
Now is the time to
correct this.
•
Fit the blower unit by placing it into the rear
of the insert box and engage the back edge of
the mount into the raised cleats on the floor
of the box. Fasten the front of the mount to
the bracket using the machine screw
provided.(fig.2)
•
Fit the right hand and left hand heat baffles to
the sides of the liner box using the screws
provided. (Fig.3)
•
Route the wiring harness to the left side of
the liner box, through the cutout in the left
hand heat baffle, and fasten to the side wall
using the cable tie and the lower baffle securing
screw. (fig.4)
fig. 1
fig.2
fig.3
fig.4
f i r e - p a r t s . c o m