3.
Hold coal ‘B’ upright with the
arrow pointing to the top.
Locate coal ‘B’ as shown in
figure 22.
4.
Hold coal ‘C’ upright with
the arrow pointing to the top.
Locate coal ‘C’ as shown in
figure 23.
5.
Hold coal ‘D’ upright with the
arrow pointing to the top.
Locate coal ‘D’ as shown in
figure 24.
6.
Hold coal ‘E’ upright with
the arrow pointing to the top.
Locate coal ‘E’ as shown in
figure 25.
Page 31
©
GDC Group Ltd. 2014
INSTALLER GUIDE
Figure 25.
Figure 24.
Figure 23.
Figure 22.
Содержание 541 Dream
Страница 4: ...Page 4 GDC Group Ltd 2014 INSTALLER GUIDE FOR OWNER GUIDE SEE PAGES 47 TO 59 INSTALLER GUIDE...
Страница 11: ...Page 11 GDC Group Ltd 2014 Figure 2 Recess and flue hole dimensions INSTALLER GUIDE Figure 1 Continued...
Страница 42: ...Page 42 GDC Group Ltd 2014 OWNER GUIDE OWNER GUIDE FOR WARRANTY AND SERVICE INFORMATION SEE PAGES 55 TO 59...
Страница 54: ...Page 54 GDC Group Ltd 2014...