
5
watches, jewelry and loose fitting clothing for their own protection
while operating the machine.
2.9 There must be no obstacles to obstruct the operator while in the
working area.
2.10 If machine is going to be left unattended, the handle should be
removed.
2.11 Please do not put any tools or measuring devices on the moving
parts of the machine
3. UNPACKING
3.1 After receiving machine, visually inspect for damage. Any
damage should be reported immediately to TTMC. Inc
3.2 The machine weight is approximately 103 kg. Extreme care
should be taken when un-packaging. There are many small pieces
so check all packing material for small parts.
3.3 Check and identify all parts as shown in the bill of materials, and
layout in a clean area, for easy identification.
4
.
ASSEMBLY INSTRUCTIONS
4.1 Locate a position to mount the stand base in your shop. Give
enough clearance around machine to allow for operation. Approx a 6
foot radius from the center of the machine is adequate.
4.2 Fasten the stand welding to a concrete floor and use
“
Red Head”
style concrete anchors.
Caution: This machine must be anchored to a concrete
Содержание TB-500
Страница 1: ...ROTARY DRAW BENDER MODEL TB 500 OPERATING MANUAL...
Страница 14: ...14 4 19 Install the bronze bushing as shown below 4 20 Install one of the blue thrust washers as shown below...
Страница 20: ...20 4 32 Install the lower latch plate as shown using 2 1 4 20x3 4 screws...
Страница 21: ...21 4 33 Install 3 springs and 6 screws as show below...
Страница 33: ...33 11 1...
Страница 35: ...35 11 2...
Страница 37: ...37 11 3...