
27
2)
Choose a die. either a 120 or 240 degree variety. Locate the dies
center hole with the center of the machine, install the 1” diameter
main die pin through the center, all the way until the snap ring
bottoms out.
3)
Next install the 7/8” die drive pin into the holes that line up with the
respective machine hole.
4)
Locate the proper hook sleeve holder and position it so the center
of the assembly lines up with the centerline radius of the die. and
install the 3/4” hook pin. There are two different hook sleeve holders,
one for nominal clr dies (fie: 4.0 clr) and one for 0.5 increment dies
(fie: 4.5 clr)
5)
Choose a counter die that matches your bend die and install the 1
- 1/4” counter die pin. so the gap between the die and the counter die
is approx 1/8”. For dies under 3.5 clr. The 3/4” die c’die pin supplied
Содержание TB-500
Страница 1: ...ROTARY DRAW BENDER MODEL TB 500 OPERATING MANUAL...
Страница 14: ...14 4 19 Install the bronze bushing as shown below 4 20 Install one of the blue thrust washers as shown below...
Страница 20: ...20 4 32 Install the lower latch plate as shown using 2 1 4 20x3 4 screws...
Страница 21: ...21 4 33 Install 3 springs and 6 screws as show below...
Страница 33: ...33 11 1...
Страница 35: ...35 11 2...
Страница 37: ...37 11 3...