background image

Installation manual 

 

 
 

 

 

Preparation of components: 

Sort the components based on the 
wall plans (see Technical 
specifications) and place them at 
the four sides of the house in the 
installation sequence. 

ATTENTION:

 Never place the 

components directly on grass or a 
muddy surface because it will be 
very difficult or even impossible to 
clean them up later! 

 

Foundation 

A good foundation is the most important aspect guaranteeing the duration and safety of your house. 
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the 
house, its stability and especially the matching of the doors. With a good foundation, your house will 
stand for many years more.  

Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At 
the same time make sure that there are sufficient air apertures under the house floor for ventilation.  

We recommend the following foundation options: 

 

Strip or spot foundation 

 

Foundation from concrete or pavement slabs 

 

Cast concrete bed 

Prepare the foundation so that the foundation joists are propped up on every side with intervals not 
exceeding 50-60 cm. 

Consult an expert in this field or have the foundation prepared by specialists. 

 

3 Garden house assembly 

ATTENTION

:  

  You will find included in the house package one spare log (longest wall log). 

  You will find included in the house package one spare board (longest roof or floor board). 

  The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm 

long). 

All of the details listed above ARE NOT mentioned in the specification list. 

  The drawings have the details marked with three-digit position numbers. The exact positions of 

those details that have the third digit “x” can be found in the specification list. 

Содержание OREGON 1

Страница 1: ...l prodotto Reservado el derecho a modificaciones técnicas Produsent forbeholder seg retten til å endre tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Výrobce si vyhrazuje právo na technické změny výrobku Valmistaja pidättää oikeuden tehdä tuotteeseen teknisiä muutoksia Tillverkaren har rätt att utföra tekniska förändringar för produkten Installation manual Lo...

Страница 2: ...of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that do no...

Страница 3: ... windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer s sa...

Страница 4: ... At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on every side with intervals not exceeding 50 60 cm Consult an expert in this field or have th...

Страница 5: ...orresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications Fir...

Страница 6: ...leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the window ape...

Страница 7: ...or plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder Do not step on the roof as the structure is suitable to sustain only an even load snow wind etc and not a point load Begin the installation of the roof boards from the front ed...

Страница 8: ... with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation of wind braces and facia boards Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smu...

Страница 9: ...ary shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the door...

Страница 10: ......

Страница 11: ......

Страница 12: ...BOX ...

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Отзывы: