Sequence of Operation

Optional Economizer

 - The economizer will be locked 

out when: the outside air is below economizer lockout; 
the unit is operating in dehumidification mode; or there 
is a call for heating.
 • 

Stop Wheel:

 When economizer mode is enabled 

and there is a signal for cooling, the wheel will stop 
rotating to allow free cooling.

 • 

Modulate Wheel:

 When economizer mode is 

enabled and there is a signal for cooling, the 
wheel VFD modulates wheel speed to maintain the 
discharge temperature set point.

Optional Frost Control

 - The microprocessor controller 

will output a signal when wheel frosting is occurring 
which is determined by a temperature set point (OA 
<5°F – 2°F hysteresis, adjustable) and wheel pressure 
drop increase.
 • 

Preheat:

 When frosting is occurring, the preheater 

is energized to defrost the wheel. Once the 
pressure drop decreases below the set point, the 
preheater is de-energized.

• 

Modulating Wheel:

 Includes a VFD in addition 

to the thermostat and pressure sensor. When 
modulating wheel frost control is initiated, the VFD 
will reduce the speed of the wheel, which keeps 
the exhaust air condition from reaching saturation, 
thus, eliminating condensation and frosting. If the 
outdoor air temperature is greater than the frost 
threshold temperature OR the pressure differential 
is less than the set point, the wheel will run at 
full speed. If the outdoor air temperature is less 
than the frost threshold temperature AND the 
pressure differential is greater than the set point, 
the wheel will run at reduced speed until the 
pressure differential falls below the set point. The 
temperature and pressure differential set points are 
set at the factory, but are field-adjustable. The VFD 
will be fully programmed at the factory.

Optional Energy Wheel

Start-Up

If selected, the energy wheel is installed in the unit’s 
airstream with one half of the wheel in the intake 
airstream and one half in the exhaust airstream. Air 
leakage between the two airstreams has to be kept to 
a minimum and the wheel has air seals that must be 
adjusted for that purpose. The seals must be adjusted 
at time of start-up.

Drive Belt

Inspect the drive belt. Make sure the belt rides smoothly 
in the pulley and around the outside of the wheel. Note 
the directional arrow and data information shown in the 
image.

Adjust the Air Seals

Make sure the unit power supply is locked out. 
Disconnect the wiring to the wheel module and pull 
the wheel cassette out of the cabinet on its tracks. 
Large cassettes are not removable. Then slowly rotate 
the wheel by hand to make sure there is no binding or 
misalignment. 
There is a perimeter seal located around the outside of 
the wheel and a diameter seal across the face of the 
wheel on both sides. Check to make sure that all air 
seals are secure and in good condition.
Adjust the air seals by loosening all the air seal retaining 
screws on the bearing support. Using a piece of paper 
as a feeler gauge, adjust the seals so they almost touch 
the face of the wheel while tugging slightly on the paper. 
When the wheel is rotated, there should be a slight tug 
on the paper. Tighten the screws, repeat the steps on 
the other set of seals.
Push the wheel cassette back into the unit and plug 
in the power connector. Turn the main power supply 
back on and then observe the operation of the wheel by 
opening the wheel access door slightly. Remove filters if 
necessary to observe the wheel.

Drive Belt

Adjustable 

Air Seals

Label 

showing 

cassette 

serial # and 

date code

Bearing 

Support

Drive Pulley

Retaining 

Screws

Содержание VX Series

Страница 1: ...ause bodily harm CAUTION When servicing the unit the internal components may be hot enough to cause pain or injury Allow time for cooling before servicing Only qualified personnel should install and m...

Страница 2: ...Piping Installation 12 Electrical Information 13 Control Center Components 14 Component Operation 15 Optional Component Operation 15 18 Factory Installed Refrigeration System 19 21 Start Up Unit 22 2...

Страница 3: ...f dirt water ice or snow and wipe dry before moving to indoor storage To avoid condensation allow cold parts to reach room temperature Leave coverings loose to permit air circulation and to allow for...

Страница 4: ...ilable on VX VXE 311 and 352 Packaged DX and ASHP units are shipped fully charged with refrigerant and are ready for operation upon arrival Heating There are three different optional heat sources that...

Страница 5: ...ng 311 uses furnace model PVF 200 600 or model HMA 700 800 Housing 352 use furnace model HMA 600 1200 Packaged DX System Any unit may be ordered with a packaged DX system Housing size 112 will include...

Страница 6: ...224 22 27 30 8 300 VXE 352 30 70 99 5 96 263 307 47 NA 10 450 Bottom or Side Side All dimensions are shown in inches Weight is shown in pounds and includes largest supply and exhaust fans PDX with re...

Страница 7: ...Unit Size ACS Access Side CC Control Cabinet End OAI Outdoor Air Intake NA from Unit NA from Condensing Section NA from Piping Vestibule not shown Other Indoor Mounted with IG Furnace Outdoor Mounted...

Страница 8: ...with a defrost cycle to remove ice from the outdoor coil During defrost cycles melted water may drip from the bottom of the refrigeration section under the outdoor coil In cold climates proper draina...

Страница 9: ...openings Guide unit while lowering to align with duct openings Roof curbs fit inside the unit base Make sure the unit is properly seated on the curb and level 5 Install Vestibule If unit was ordered w...

Страница 10: ...an L configuration and the area directly beneath the heat source must not have any openings such as louvers or grates No louvers or grates Installation Typical Unit Installed on Rails Supplied by Oth...

Страница 11: ...rvice and gas supply be brought into the cabinet through the end wall as shown below There are three penetrations into the cabinet that are required one for high voltage supply wiring one for low volt...

Страница 12: ...epted industry standards Pipework should be supported independently of the coils Undue stress should not be applied at the connection to coil headers 2 The condensate drain pipe should be sized adequa...

Страница 13: ...isconnect and must be compatible with the ratings on the nameplate supply power voltage phase and amperage Consult ANSI NFPA 70 and CSA C22 1 for proper conductor sizing Provide the Opening s for the...

Страница 14: ...Outdoor airflow monitor 17 Exhaust airflow monitor 18 Digital scroll controller Optional Indirect Gas Fired Furnace Note In some models two furnaces are installed to provide greater output When two fu...

Страница 15: ...ain room air temp at a desired set point Optional 0 10 VDC by others to VFD Supply fan is modulated by a 0 10 VDC field provided by others Component Operation Exhaust Fan VFD Sequence Optional Buildin...

Страница 16: ...ling mode the following conditions must be true 1 Supply air temperature above minimum low supply temperature limit 35 F 2 Outside air temperature above the cooling ambient lockout 55 F adj To operate...

Страница 17: ...en the system undergoes test and balance Hot Gas Reheat Valve Units equipped with a reheat coil use a three way valve with actuator to control the supply air discharge temperature of the unit during d...

Страница 18: ...l be fully programmed at the factory Optional Component Operation Rotation Sensor The rotation sensor monitors energy wheel rotation If the wheel should stop rotating the sensor will close a set of co...

Страница 19: ...ble and is located on the side of the evaporator coil and can be accessed through the coil access panel 13 Evaporative Coil 14 Low Limit Pressure Switch The switch is installed on the suction line and...

Страница 20: ...Source Heat Pump with Three Way Hot Gas Reheat 4WV Outdoor Coil Indoor Coil Outdoor Airflow Hot Gas Reheat Coil Supply Airflow Compressor PT HRV LPS SG SG EXV FDS HPS SV HCV ACC 4WV Outdoor Coil Indoo...

Страница 21: ...rsing valve to reverse the direction of refrigerant flow switching the unit between heating and cooling mode 12 Electronic Expansion Valve EXV or Thermostatic Expansion Valve TXV An expansion valve is...

Страница 22: ...or Allow 5 minutes between on cycles to prevent compressor damage DX system is charged with refrigerant Start up must be performed by EPA Certified Technician Start Up Unit Every installation requires...

Страница 23: ...ital scroll compressor The variable speed compressor uses internal stator heating Each compressor needs power supplied to it 24 hours prior to start up If start up is scheduled in 24 hours unlock the...

Страница 24: ...Energy Wheel Motor if equipped L1 Amps L2 Amps L3 Amps Condensing Fans PDX only Condensing Fan 1 L1 Amps L2 Amps L3 Amps Condensing Fan 2 L1 Amps L2 Amps L3 Amps Condensing Fan 3 L1 Amps L2 Amps L3 Am...

Страница 25: ...ween 10 and 20 F 0 reheat or should be between 10 and 30 F 100 reheat Deg F Deg F Deg F Deg F Subcooling Models VX VXE 352 Should be between 10 and 15 F 0 reheat or should be between 2 and 10 F 100 re...

Страница 26: ...n Line Temp Deg F Deg F Moisture Indicating Sight Glass Liquid Visible Yes No Yes No Color of Center Dot Purple Pink Purple Pink Heating Superheat Should be between 10 and 20 F Deg F Deg F Subcooling...

Страница 27: ...ntrol center door Vibration Excessive vibration may be experienced during initial start up Left unchecked excessive vibration can cause a multitude of problems including structural and or component fa...

Страница 28: ...ess ENTER 7 Set number of flows and press ENTER 8 Set flow and press ENTER 9 Set flow to actual CFM measured by Test and Balance and press ENTER 10 Wait for calibration before cycling power 11 Proceed...

Страница 29: ...re that you do not have power at the alert signal leads The unit is now ready for operation Setscrew on front of switch must be manually adjusted after the system is in operation Negative pressure con...

Страница 30: ...the factory but are field adjustable The VFD will be fully programmed at the factory Optional Energy Wheel Start Up If selected the energy wheel is installed in the unit s airstream with one half of...

Страница 31: ...e when a clip is open the clip will jam against the bearing support bar and could cause damage Cleaning Maintenance or cleaning of the wheel segments should be done with the segments removed from the...

Страница 32: ...dition is corrected It is located in the main control center Variable Frequency Drive VFD Variable frequency drives have a display screen that will show an alarm condition If a fault such as a voltage...

Страница 33: ...rted windings in motor Replace motor Low airflow cfm Unit damper not fully open Adjust damper linkage or replace damper motor System static pressure too high Improve ductwork to eliminate losses using...

Страница 34: ...and repair Replace fuse after correcting problem Low line voltage Check line voltage If more than 10 from compressor marking correcting is necessary Compressor motor protector open Motor thermal prote...

Страница 35: ...for two hours Recheck for open circuit Improper refrigerant charge Check subcooling Improperly wired Review wiring schematics Loose wiring Check all connections Defective start relay Replace relay Mot...

Страница 36: ...sible air recirculating Clean coil Condenser fan motor defective Check condenser fan motor Too much refrigerant Check subcooling Remove excess refrigerant Non condensable in system Remove non condensa...

Страница 37: ...ings Refrigerant flood back Check thermal expansion valve setting Check for refrigerant overcharge Check crankcase heater operation Reheat flush cycle inadequate Contact factory Not enough capacity or...

Страница 38: ...ntenance session and observations and then establish a maintenance schedule that is appropriate for the installation The following is provided as a guideline Maintenance Frequency Monthly 1 External F...

Страница 39: ...ces only Removing dust and grease buildup on the motor housing assists proper cooling Never wash down the motor with high pressure spray Greasing of motors is only intended when fittings are provided...

Страница 40: ...0x25x2 2 20x25x2 4 20x20 VXE 212 4 25x25x2 4 16x25x2 4 16x25x2 8 16x25 VXE 311 6 20x25x2 7 16x20x2 7 16x20x2 12 16x20 VXE 311 6 25x25x2 8 20x20x2 20x24x2 8 20x20x2 20x24x2 12 16x20 VXE 352 30 40 tons...

Страница 41: ...212 300 14 8 23 3 38 1 44 1 6 6 6 400 6 6 6 500 14 9 23 6 25 2 57 1 6 6 6 B A C D 500MBH 300 400MBH A B C D 200 300MBH 100 150MBH C A B D C A B D COMBUSTION AIR INLET EXHAUST OUTLET IG FURNACE ACCESS...

Страница 42: ...ng Location Model Furnace Size MBH A B C D E F G H I J Inlet Dimensions Outlet Dimensions Length Height Edge Thickness Length Height VX VXE 352 600 6 13 8 17 2 20 5 50 NA NA NA NA NA 21 5 6 1 6 5 5 5...

Страница 43: ...X 112 15I 3775 VX 112 15D 3775 VX 112 15S 3775 VX 112 15A 4300 VX 212 15I 4100 VX 212 15D 4100 VX 212 15S 4100 VX 212 15A 4800 Model Airflow SCFM VX 212 17 5I 4650 VX 212 17 5D 4650 VX 212 17 5S 4650...

Страница 44: ...8th Avenue North Minneapolis MN 55411 Main 612 877 4800 MORE INFORMATION UNIT SCHEMATICS For configuration and connection questions see the schematics that shipped with your unit They can typically be...

Страница 45: ...ause bodily harm CAUTION When servicing the unit the internal components may be hot enough to cause pain or injury Allow time for cooling before servicing Only qualified personnel should install and m...

Страница 46: ...ntenance session and observations and then establish a maintenance schedule that is appropriate for the installation The following is provided as a guideline Maintenance Frequency Monthly 1 External F...

Страница 47: ...ces only Removing dust and grease buildup on the motor housing assists proper cooling Never wash down the motor with high pressure spray Greasing of motors is only intended when fittings are provided...

Страница 48: ...0x25x2 2 20x25x2 4 20x20 VXE 212 4 25x25x2 4 16x25x2 4 16x25x2 8 16x25 VXE 311 6 20x25x2 7 16x20x2 7 16x20x2 12 16x20 VXE 311 6 25x25x2 8 20x20x2 20x24x2 8 20x20x2 20x24x2 12 16x20 VXE 352 30 40 tons...

Страница 49: ...including proper refrigerant charge and repair of minor refrigerant leaks outside the coil At the completion of start up an approved start up record must be submitted to the Unison service department...

Страница 50: ...te of shipment from the Unison factory whichever occurs first The ship date for the units noted above is 5 4 2020 Please refer to the Unison Comfort Technologies terms and conditions of sales for addi...

Страница 51: ......

Страница 52: ......

Страница 53: ......

Страница 54: ......

Страница 55: ......

Страница 56: ......

Страница 57: ......

Страница 58: ......

Страница 59: ......

Страница 60: ......

Страница 61: ......

Страница 62: ......

Страница 63: ......

Страница 64: ......

Страница 65: ......

Страница 66: ......

Страница 67: ......

Страница 68: ......

Страница 69: ......

Страница 70: ......

Страница 71: ......

Страница 72: ......

Отзывы: