manualshive.com logo in svg
background image

No.Q-0600-0057-05

* When you must perform calibration, follow the procedure 

described in "8. Maintenance, Inspection and Adjustment."

(*While  performing  calibration,  do  not  touch  any  control  which 
does not need adjustment.)

* When a measurable limit (FS.

±

approx. 2%) is exceeded, the 

display starts flashing.
(The reading remains unchanged.)
When zero-shifting has been performed, the zero-shifting amount 
is added to or subtracted from the original measurable limits.

5. Zero-shifting Function

Zero adjustment can be performed by operating the 
zero-shifting key hidden behind the front panel.
Perform zero adjustment when, for example, the zero point 
for measurement is deviated.

* Remove the outer frame of the front panel, and then take 

the front panel out by hooking the notch with a screwdriver, 
etc.

* Place the sensor in a state where the reading should be 

zero.

* Pressing the zero-shifting key for at least 2 seconds, the 

reading is forcefully zeroed.    (Zero shifting)

* Pressing the zero-shifting key for 5 seconds or longer, 

zero shifting is canceled.

* Do not operate any switch other than the zero-shifting key.
* When the difference between the readings before and after 

zero shifting becomes 

±

2%FS or more, a warning 

message "          " is temporarily shown.

(Z e ro  sh if t in g  is  p e rf orm e d  eve n  if  th e  w a rn in g m e ssa ge  "             " 
is  s h ow n . )
(I f   t h e   wa rn in g  m e ss a ge   "            "  is  s h o wn ,   it  m ay  b e   im p o ss ib le  
to   m e a su re   F S .)
(W h e n   F S   n e e d s  t o   b e  m ea s u re d ,   ca n c e l  ze ro   s h if t in g,   a n d   m a ke  
a d ju st m e n t  w it h   th e   re ad in g  ze ro -ad ju st in g  c on t ro l. )

7

Содержание VPRHS-U

Страница 1: ...uy your excess underutilized and idle equipment along with credit for buybacks and trade ins Custom engineering so your equipment works exactly as you specify Critical and expedited services Leasing R...

Страница 2: ...Keys 3 Terminal Connections 4 Particularly Important Precautions 5 Zero shifting Function 6 Optional Peak holding Function 7 Optional Auto zeroing Function 8 Maintenance Inspection and Adjustment 9 I...

Страница 3: ...specified power supply voltage will cause fire shock hazards or failures Never modify the sensor or its accessories Neglecting this will cause fire shock hazards or failures Never touch any terminal o...

Страница 4: ...injury Be sure to confirm that power is turned OFF before relocating the sensor or changing the wiring Neglecting this may cause shock hazards or failures When one of abnormal conditions shown below i...

Страница 5: ...No Q 0600 0057 05 1 General Specifications 4...

Страница 6: ...ommon terminal for control input 4 Sensor connection D INPUT 13 SET1 output S N O SO Unused 5 Sensor connection E Shield Analog output 14 SET1 output S N C SO N O 6 Analog output 15 SET1 output COM 7...

Страница 7: ...g the sensor cable in parallel with a power line etc or in the same conduit Securely ground the grounding terminal F G frame ground 4 Particularly Important Precautions Be sure to use the amplifier an...

Страница 8: ...measurement is deviated Remove the outer frame of the front panel and then take the front panel out by hooking the notch with a screwdriver etc Place the sensor in a state where the reading should be...

Страница 9: ...easurement operation P Peak holding 7 Optional Auto zeroing Function Short circuiting the terminal No 11 Z and the terminal No 12 COM automatically zeros the current reading When the terminals are ope...

Страница 10: ...when the rated pressure is applied and when 1 2 of the rated pressure is applied 4 If the reading is out of the limits perform calibration by following the procedure below 1 Remove the outer frame of...

Страница 11: ...ics Analog input schematic A2 A3 A4 and A5 Control input schematic P and Z Analog output schematic A1 A2 A4 and A5 To internal CPU board 24V Control input 10K COM 0 1uF DG Output AG 100 1 4W Internal...

Страница 12: ...11 VPRVS Series VPRHS Series 48 9 9 9 1 9 9 9 96 2 1 1 5 5 104 89 5 41 5 17 5 127 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 9 9 9 48 SET1 1 96 9 9 9 SET2 2 5 5 104 89 5 8 7 6 5 4 3 2 17 16 15 14 1...

Страница 13: ...uipment Have surplus equipment taking up shelf space We ll give it a new home Learn more Visit us at artisantg com for more info on price quotes drivers technical specifications manuals and documentat...

Отзывы: