0020153953_05 - 03/15 - Vaillant
23
START-UP
4.4.4
Case No 4
3
1
1
4
4
3
2
2
1 Heat
pump
2 Boiler
3 Heating
4 Plug
4.5
Passage and routing of the
temperature sensor cable
i
Notes
The temperature sensor (VR 10) is not supplied.
It must be ordered separately.
i
Notes
The temperature sensor cable must be passed
through the hole provided for this purpose.
1
2
3
3
1 Temperature
sensor
housing
2 Temperature
sensor
cable
3 Temperature
sensor
cable passage
i
Notes
The temperature probe must be assembled
using thermal paste for good heat transfer.
5
Start-up
►
For
fi
lling, refer to the installation instructions of the heat
pump.
►
Check the electrical and water installation.
►
Check all connections for leaks.
►
Purge your heating system.
5.1
Purging the appliance
1
1 Air
vent
►
Open the air vent (1), when
fi
lling the heating circuit with
water.
►
Close the vent as soon as water
fl
ows (repeat the
operation several times if necessary).
Содержание VWZ MPS 40
Страница 1: ...DE BEde AT GB IT CHde CHit ES CZ VWZ MPS 40 Installation instructions ...
Страница 2: ......
Страница 13: ...0020153953_05 03 15 Vaillant 13 RECYCLING UND ENTSORGUNG ...
Страница 14: ......
Страница 25: ......
Страница 26: ......
Страница 37: ......
Страница 38: ......
Страница 49: ......
Страница 50: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......