![Vaillant VR 50 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/vaillant/vr-50/vr-50_operating-and-installation-instructions_3198809042.webp)
Care and maintenance
42
Operating and installation instructions 0020248967_00
9
A
B
4. Insert the batteries, making sure that
the poles are the right way round.
– After inserting the batteries, the
product runs through a self-test for
approx. two seconds. Initialisation
then takes place.
5. After inserting the batteries, observe
the flashing sequence of the signal LED.