background image

Operating instructions for auroSTOR 0020111120_02

3

1  

Notes on the documentation

The following instructions are intended to guide you 
through the entire documentation. 
Further documents apply in combination with these 
operating instructions. 

We do not accept liability for any claims or damages 
resulting from failure to observe these instructions.

 

1.1 

Other applicable documents 

 

>

When operating the solar heating system, you must 
observe all operating instructions for system compo-
nents and for other accessories used in the system. 

These operating instructions are included with the indi-
vidual components and accessories.

1.2 Storing 

documents

 

>

Store these operating instructions and all other appli-
cable documents in such a way that they are available 
whenever required.

1.3 Symbols 

used

The symbols used in the text are explained below.

i

Symbol that denotes useful tips and 
information

 

>

  

Symbol for a required action

1.4 

Applicability of the instructions

These instructions apply for the following only:

Unit type

Cylinder volume

Article number

VIH S GB 210/2 S 

210 litres

0020115422

VIH S GB 260/2 S 

260 litres

0020115425

VIH S GB 310/2 S 

310 litres

0020115428

Table 1.1 Applicability of the instructions

 

>

The article number of the unit is displayed on the identi-
fication plate.

1.5 

Cylinder identification plate

The identification plate is attached to the front of the 
cylinder at the factory.

1.6 CE 

label

CE labelling shows that, based on the type overview, the 
units comply with the basic requirements of the applica-
ble directives.

1.7 Benchmark

i

  Vaillant Ltd. supports the Benchmark Initiative. 

A benchmark checklist for commissioning gas-
fired boilers is attached to these installation ins-
tructions. It is very important that this docu-
ment be filled out properly when installing, com-
missioning and handing-over to the operator of 
the installation.

Notes on the documentation 1

Содержание VIHSGB210

Страница 1: ...Operating instructions For the operator GB IE Operating instructions Solar heating system with auroSTOR Solar hot water system...

Страница 2: ...ty instructions 5 3 Description of the unit 6 4 Operation 7 4 1 Operating the solar heating system 7 4 2 Controlling the solar heating system 7 4 3 Setting the hot water temperature 8 4 4 Switching of...

Страница 3: ...ymbol that denotes useful tips and information Symbol for a required action 1 4 Applicability of the instructions These instructions apply for the following only Unit type Cylinder volume Article numb...

Страница 4: ...r insufficient experience and or knowledge unless they are supervised by a person who is responsible for their safety or have been instructed by this person on how to use the unit Children must be sup...

Страница 5: ...advice The temperature of the stored water could reach high temperatures after solar charging and your Vaillant solar installer will have fitted a tempering valve so as to pre vent this reaching the...

Страница 6: ...Safety devices The solar cylinder has been provided with all safety and control devices for operation of the unvented domestic hot water supply Temperature pressure relief valve 90 C 7 bar Pressure r...

Страница 7: ...b Caution Risk of damage from leaks Leaks in the water pipes between the cylin der and tap can result in water damage If a leak occurs close the cold water stop valve on the cylinder Contact a compet...

Страница 8: ...he auroSTOR has been installed in a cupboard used for airing clothes make sure that clothing and other objects are not placed on the cylinder control devices pipes or other system compo nents i Always...

Страница 9: ...form a competent person fluid or steam is escaping from the expansion relief valve Inform a competent person the controller issues a message telling me the sensor is faulty or there is a cable break I...

Страница 10: ...for the system to be maintained and repaired and improper maintenance and repair can impair the operational safety of the unit leading to personal injury and material damage Never attempt to perform m...

Страница 11: ...petent persons in accordance with all current and relevant safety building control and planning regulations and in full compliance with the manufacturer s instructions All unvented domestic hot water...

Страница 12: ...kW 16 7 16 5 16 0 Flow rate for primary heat exchanger performance l min 23 3 Primary heat exchanger pressure drop mbar 79 78 79 Primary heat exchanger volume Liter 2 37 Primary heat exchanger surfac...

Страница 13: ...ed valve 230 240 V 50 Hz Cylinder thermostat 230 240 V 50 Hz Thermal cut out solar 230 240 V 50 Hz Material data Cylinder body material Stainless steel 1 4521 Cylinder jacket material Polypropylene In...

Страница 14: ......

Страница 15: ......

Страница 16: ...0020111120_02 GBIE 092013 Subject to change Manufacturer Supplier...

Отзывы: