Installation 5
0020237954_01 Installation instructions
29
Conditions
: Installation on the wall, Upward direc-
tion of extract air
A
B
4x
▶
Push the four latching lug outwards and
pull the adaptable extract air connec-
tion out of the housing.
▶
Turn the connecting side for the extract
air pipe upwards.
CLICK
▶
Insert the adaptable extract air connec-
tion back into the housing.
◁
The extract air connection clicks into
place.
7. Break through the designated points
for the grommet.
8. Using the product packaging, cut out
a cover as protection for the housing
when plastering.
Conditions
: Installation on the ceiling
▶
Guide the cable through the grommet.
▶
Insert the housing into the ceiling.
▶
Use suitable rawl plugs and screws.
▶
Position the cover onto the housing.
Conditions
: Installation on the wall
A
B
▶
Guide the cable through the grommet.
▶
Insert the housing into the wall.
Содержание VAE 190/1 RHT
Страница 37: ...0020236694_00 recoVAIR Country specifics 35 ...
Страница 38: ...36 Country specifics recoVAIR 0020236694_00 ...
Страница 39: ...0020236694_00 recoVAIR Country specifics 37 ...