background image

4 Set-up

6

Installation and maintenance instructions uniSTOR 0020221302_02

3.4

Hot Water Association

Vaillant is a full member of the Hot Water Association and
promotes the scheme in association with its cylinder range.
Details are available on the web site www.vaillant.co.uk

4

Set-up

4.1

Observing the requirements for the
product's installation site

Caution.
Material damage due to frost

If the water in the system freezes, there is
a risk of damage to the domestic hot water
cylinder.

Install the cylinder in a dry, permanently
frost-free room.

Caution.
Material damage due to escaping water

In the event of damage, water may escape
from the cylinder.

Select the installation location so that, in
the event of damage, large volumes of
water can be drained safely (e.g. into a
floor drain).

Caution.
Material damage due to high load

When filled, the cylinder may damage the
ground on which it stands due to its weight.

Take into consideration the weight of the
filled cylinder and the load-bearing capa-
city of the floor.

If required, reinforce the installation area.

Select a sensible installation site and take into consideration
the routing of the pipework system.

Install the cylinder as close as possible to the heat generator
in order to minimise heat losses.

Set up the product in a suitable location in a room and, when
doing so, pay attention to the following points:

Plan the installation of the tundish (

Page 9).

The installation surface must be even and have sufficient
load-bearing capacity to support the operating weight of
the product.

The installation site must be frost-free.

Install the product in such a way that the thermostat and
immersion heater can be accessed easily.

Leave sufficient space around the product for installing,
maintaining and replacing the expansion vessel.

To prevent heat losses, the pipework system must have heat
insulation in accordance with the applicable energy-saving
regulations.

4.2

Transport

Caution.
Risk of material damage caused by incor-
rect transport.

The components attached to the cylinder
must not be used to transport the cylinder.
Otherwise there is a risk that the cylinder
could malfunction.

Do not use the components attached to
the cylinder to transport it.

Always transport the unit as illustrated above.

Never transport the unit while it is horizontal.

Содержание uniSTOR VIH GB /3 BES Series

Страница 1: ...llation and maintenance instructions uniSTOR VIH GB 3 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaillan...

Страница 2: ...duct dimensions standard diameter 8 5 Installation 8 5 1 Setting up the unit horizontally 8 5 2 Hydraulic connection 8 5 3 Electrical installation 11 6 Start up 13 6 1 Setting the immersion heater the...

Страница 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Страница 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Страница 5: ...that it meets the requirements of the appropriate Building Regu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer...

Страница 6: ...tion area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise heat l...

Страница 7: ...ng the product Carefully unpack the product 3 Remove the product from its box 4 Remove the protective film from all of the product s components 4 4 Checking the scope of delivery Check that the scope...

Страница 8: ...eat transfer when welding The heat that is transferred during welding may damage the cylinder and its components as well as the connection seals Protect the product and its components Do not weld the...

Страница 9: ...maximum clearance of 600 mm from the connection of the temperature and pressure relief valve It must be installed in the same room as the cylinder but at a sufficient distance from electrical compone...

Страница 10: ...from the tundish to the drain has a constant downward gradient of at least 1 200 The discharge pipe for the heat generator expansion relief valve can be connected to the horizontal discharge pipe for...

Страница 11: ...supply Secure the power supply against being switched back on Caution Risk of material damage by drilling through the product The product may be damaged by drilling work Do not drill through the produ...

Страница 12: ...he cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater con nection Diameter of the cabl...

Страница 13: ...it 1 Connect the thermostat for the primary circuit and the thermal cut out Diameter of the cable 1 5 mm Condition S plan 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 L N 2 1 3 2 2 4 4 1 8 L 8L 8L SL Conne...

Страница 14: ...for the heat gener ator 3 Move the lever to AUTO 4 Remove the cover for the electrics 5 Set the product s thermostat and the immersion heater s thermostat Setting the thermostats 60 6 Start up the hea...

Страница 15: ...ressure of the expansion vessel 1 Drain the product Page 15 2 Measure the pre charge pressure of the expansion ves sel at the vessel valve Condition Pressure 0 3 MPa 0 3 bar Top up the expansion vesse...

Страница 16: ...1 Set the expansion vessel 2 Interrupt the power supply of the product and heat generator check the thermal cut outs and replace these if you find any defects B Inspection and maintenance work Overvi...

Страница 17: ...water and domestic hot water 174 2 kg 198 7 kg 238 6 kg 259 6 kg 320 1 kg 364 7 kg Technical data Hydraulic connection VIH GB 120 3 BES VIH GB 150 3 BES VIH GB 180 3 BES VIH GB 200 3 BES VIH GB 250 3...

Страница 18: ...ntenance instructions uniSTOR 0020221302_02 VIH GB 120 3 BES VIH GB 150 3 BES VIH GB 180 3 BES VIH GB 200 3 BES VIH GB 250 3 BES VIH GB 300 3 BES Propellant for insulating material GWP 5 GWP 5 GWP 5 G...

Страница 19: ...Appendix 0020221302_02 uniSTOR Installation and maintenance instructions 19 D Commissioning Checklist...

Страница 20: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Страница 21: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Страница 22: ...Discharge pipe 9 Documents 5 Draining the product 15 E Electricity 3 F Filling and purging the heating circuit 14 Filling and purging the product 14 Frost 4 H Handing over to the end user 14 I Identi...

Страница 23: ......

Страница 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Отзывы: