Obtaining hot water
'On opening a hot water tap
@
at a supply point (basin, shower, bath, etc.) the boiler
will operate automatically to provide hot water. (A short delay may be experienced in
obtaining hot water at the tap, depending on the length of pipework and your system
layout. This delay can be reduced by not fully opening the tap until the water is flowing
at the desired temperature).
With. the tap fully open you will receive the maximum flow rate of hot water. Should
you require hotter waterreduce
the' flow by partially closing the tap.
On dosing the tap the boiler automatically switches off (or continues to operate for
central heating if required). The pump may continue to operate for a short
14
period.
.
.
l
:1~.
,
.
~~
.
.
~
,
)
,
::·8
I
;:·8
8;-B
G)
-
57166
Содержание TURBOmax VUW 242/1E
Страница 1: ...1 i 57166 ...
Страница 15: ... 1 nm S 11 I 1 2 I l0 1 nml 8 I 0 11 3 2 I 86 nm 8 ...
Страница 21: ...13 14 1 ...