Domestic .hot water
operation
Turning on Main On/Off Control
With the main
ani
aff control
CD
in the off position (' 0'),
and the central heating
control
CD
in the '
.t:"
position, turn on the electricity supply. Turn main on/off
control
CD
into the'
I'
position, the mains on in~icator will illuminate.
Note:
The main on/off control should only be operated If· os described under 'Check water contents'
on page
7 . the boiler is correctly filled with water.
At this stage the TURBOmax is ready to supply hot water.
j
.1 ~ .
,
.
~}
~
,
a'116G
Содержание TURBOmax VUW 242/1E
Страница 1: ...1 i 57166 ...
Страница 15: ... 1 nm S 11 I 1 2 I l0 1 nml 8 I 0 11 3 2 I 86 nm 8 ...
Страница 21: ...13 14 1 ...