Gas supply adjustments (Commissioning Part II) 7
Instructions for Installation and Servicing turboMAX pro R3
21
7 Gas supply adjustments
7.1 Gas inlet working pressure
To check the gas inlet working pressure:
• Lower the front panel of the boiler.
• Lower the control panel.
• Slacken the sealing screw (1) located at measuring
point ”P.IN”.
• Attach U-gauge to the inlet test point on the gas valve
(2).
• Ensure that the gas service valve is open.
• Set the DHW temperature control to maximum and
fire the boiler at full rate by opening a hot water tap.
• Ensure that the hot water outlet temperature
adjustment control is set to maximum.
• Check that the U-gauge is reading in the range of 18 to
20 mbar. (If the pressure is not within this range this
should be investigated before continuing with the
commissioning preocedure.
(Lower pressures than this range are indicative of an
incorrectly sized or partially blocked gas supply.)
• Turn off the hot tap.
• Remove U-gauge, tighten test point sealing screw (1).
• Test for soundness.
• Record appliance working gas inlet pressure (mbar) in
the Benchmark gas boiler commissioning checklist.
Fig. 7.1: Gas inlet working pressure
1
1
2
7.2 Main burner pressure
The burner pressure on this appliance has been factory
set and does not require adjustment. To check the main
burner pressure connect the U-Gauge as follows depen-
ding on the gas type.
• Remove front case and combustion chamber cover.
Note!
All measurements and adjustments to the gas
valve must be done with the combustion cham-
ber cover removed.
For natural gas appliances:
• Slacken the sealing screw (1) at test point on the gas
valve and attach one arm of a U-gauge (2) to the test
point.
For LPG appliances:
• Slacken the sealing screw (1a) at test point on the bur-
ner inlet gas pipe and attach one arm of a U-gauge
(2a) to the test point.
Fig. 7.2
1
1a
2
2a
Connection for LPG
Connection for Natural gas
833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 21
Содержание turboMAX pro 24/2 E
Страница 39: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 39...
Страница 40: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 40...
Страница 41: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 41...
Страница 42: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 42...
Страница 43: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 43...
Страница 44: ...833792_42 GB R3 03 2005 Subject to alteration 833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 44...