24
BOILER INSTALLATION SEQUENCE
Cold water mains inlet
and hot water outlet
(TURBOmax Plus)
Flush all foreign matter from the mains
supply before connecting to the
boiler.
●
Connect the cold water service
valve (
1
) to the cold inlet water
connection (
3
) of the appliance
with the washer (
2
) provided and
tighten.
●
Connect the 15 mm cold water
inlet pipe copper tail (
4
) to the cold
water service valve (
1
) and tighten.
●
Connect the 15 mm hot water
outlet copper tail (
6
) to the hot
water outlet connection of the
appliance (
8
) with the washer
provided (
7
) and tighten.
Note: The hot water outlet union
nut is packed in with the PRV fitting
pack.
●
Connect the cold water service
pipe and hot water outlet pipework
to the copper tails.
1
2
3
4
6
7
8
I
0
Euro B/S 045/0GB_Plus
Fig. I.7: Fitting the hot and cold water connections TURBOmax Plus
TURBOmax Plus