![Vaillant ecoFIT pure Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/vaillant/ecofit-pure/ecofit-pure_installation-and-maintenance-instructions-manual_848899037.webp)
Appendix
0020230533_01 ecoFIT pure Installation and maintenance instructions
37
F
Inspection and maintenance work
–
Overview
The table below lists the manufacturer requirements with respect to minimum inspection and maintenance intervals. If na-
tional regulations and directives require shorter inspection and maintenance intervals, you should observe these instead of
the intervals listed in the table.
No.
Work
Inspection
(annual)
Mainten-
ance
(must be
carried out
at regular
intervals)*
1
Check the air/flue pipe for leak-tightness and to ensure that it is fastened correctly. Make sure
that it is not blocked or damaged and has been installed in accordance with the relevant Installa-
tion Manual.
X
X
2
Check the general condition of the product. Remove dirt from the product and from the vacuum
chamber.
X
X
3
Visually inspect the general condition of the heat exchanger. In doing so, pay particular attention
to signs of corrosion, rust and other defects. If you notice any damage, carry out maintenance
work.
X
X
4
Check the gas connection pressure at maximum heat input. If the gas connection pressure is not
within the correct range, carry out maintenance work.
X
X
5
Check the CO
₂
content (the air ratio) of the product and, if necessary, adjust it. Keep a record of
this.
X
X
6
Disconnect the product from the power mains. Check that the electrical plug connections and
other connections are seated correctly and correct these if necessary.
X
X
7
Close the gas isolator cock and the service valves.
X
X
8
Drain the product on the water side. Check the pre-charge pressure of the expansion vessel
and, if required, top up the expansion vessel (approx. 0.03 MPa/0.3 bar below the system filling
pressure).
X
9
Remove the gas-air mixture unit.
X
10
Check the seals in the combustion area. If you see any damage, replace the seals. Replace both
burner seals
each time
it is opened and accordingly
each time
maintenance work is carried out.
X
11
Clean the heat exchanger.
X
12
Check the burner for damage and replace it if necessary.
X
13
Check the condensate siphon in the product, clean and fill if necessary.
X
X
14
Install the gas-air mixture unit.
Caution: Replace the seals.
X
15
Open the gas isolator cock, reconnect the product to the power mains and switch the product on.
X
X
16
Open the service valves, fill the product/heating installation to 0.05-0.3 MPa/0.5-3.0 bar (depend-
ing on the static height of the heating installation), and start the purging programme
P.XX
.
X
17
Carry out a test operation of the product and heating installation and, if required, purge the sys-
tem once more.
X
X
18
Visually inspect the ignition and burner behaviour.
X
X
19
Check the CO
₂
content (the air ratio) of the product again.
X
20
Check the product for gas, flue gas, water and condensate leaks, and repair if necessary.
X
X
21
Record the inspection/maintenance work carried out.
X
X
*Note: For those appliances which are not part of an annual service agreement/policy, maintenance must be carried out at least every
5 years.