background image

5

Operating manual ecoCRAFT 0020058717_03

2.3 Regulations

For installation of the appliance laws, regulations, tech-
nical rules and standards must be considered and ad-
hered to ensure the safe installation of your appliance.

2.3.1 

Regulations (Great Britain and Eire)

Attention shall be made to the regulations, guidelines 
and standards in force. In particular reference shall be 
given to the following regulations, guidelines, standards 
and rules:
-  The electrical connections to the boiler MUST be in ac-

cordance with the I.E.E Wiring Regulations, and tested 
accordingly.

-  The Clean Air Act 1993 and the 3rd Edition of the 

1956 Clean Air Act.

-  The Building Regulations England and Wales, The 

Building Standards Scotland and any requirements de-
termined by the local authorities within.

-  Water supply (water fittings) regulations 1999

Detailed recommendations are also contained in the fol-
lowing documents:

BS 5854

  Code of practice for flues and flue structures 

in buildings.

BS EN 12828

 Design for water-based heating systems.

BS 6644

  Specification for Installation of gas-fired hot 

water boilers of rated inputs between 70 kW 
(net) and 1.8MW (net) (2nd and 3rd family 
gases).

BS 6880

  Code of practice for low temperature heating 

systems of output greater than 45 kW. 

 

Part 1 Fundamental and design considera-
tions.
Part 2 Selection of equipment.
Part 3 Installation, commissioning and main-
tenance.

BS 6981

   Installation of low pressure gas pipework of 

up to 28 mm in domestic premises.

BS 7074

  Application selection and installation of ex-

pansion vessels and ancillary equipment for 
sealed water systems.
Part 1 Code of practice for domestic heating 
and hot water. 
Part 2 Code of practice for low and medium 
temperature hot water systems.

BS 6700

  Specification for design, installation, testing 

and maintenance of services supplying water 
for domestic use within buildings and their 
curtilages.

Institute of Gas Engineers Publications

IGE/UP/1

    Soundness testing and purging of industrial 

and commercial gas installations.

IGE/UP/1A

  Soundness testing and purging of small low 

pressure industrial and commercial natural 
gas installations.

IGE/UP/10

  Installation of gas appliances in industrial 

and commercial premises.
Part 1 Flued appliances

Instructions for operation

3.1 Manufacturer's 

guarantee

Vaillant warranty

Vaillant provide a full parts and labour warranty for this 
appliance. 
The appliance must be installed by a suitably competent 
person in accordance with the Gas Safety (Installation 
and Use) Regulations 1998, and the manufacturer’s in-
structions. In the UK ‘CORGI’ registered installers under-
take the work in compliance with safe and satisfactory 
standards.
All unvented domestic hot water cylinders must be in-
stalled by a competent person to the current building 
regulations at the time of installation (G3).

Terms and conditions apply to the warranty, details of 
which can be found on the warranty registration card in-
cluded with this appliance.

Failure to install and commission this appliance in com-
pliance with the manufacturer’s instructions may invali-
date the warranty (this does not affect the customer’s 
statutory rights).

3.2 Intended 

use

Valliant ecoCRAFT gas-fired condensing boilers are 
state-of-the-art appliances which have been constructed 
in accordance with recognised safety regulations. Nev-
ertheless, there is still a risk of injury or death to the 
user or others, or of damage to the appliance and other 
property in the event of improper use or use for which it 
is not intended.
The unit is not intended for use by persons (including 
children) with reduced physical, sensory or mental capa-
bilities, or lack of experience and/or knowledge, unless 
they are supervised or have been given instruction con-
cerning use of the unit by a person responsible for their 
safety. Children must be supervised to ensure that they 
do not play with the unit.
The units are intended as heat generators for closed 
hot-water central heating installations and for central 
hot water preparation. Any other use or use beyond 
that specified shall be considered as improper use. The 
manufacturer/supplier is not liable for any resulting 
damage. The user alone bears the risk.
Intended use includes the observance of the operating 
and installation manual and all other applicable docu-
ments, as well as adherence to the maintenance and in-
spection conditions.

a

 Caution!

Any improper use is forbidden.

Safety 2

Instructions for operation 3

Содержание ecoCRAFT VKK GB 1206/3-E-H

Страница 1: ...For the owner Operating manual ecoCRAFT Gas condensing boiler VKK GB 806 3 E H VKK GB 1206 3 E H VKK GB 1606 3 E H VKK GB 2006 3 E H VKK GB 2406 3 E H VKK GB 2806 3 E H GB ...

Страница 2: ...s 2 1 2 Symbols used 2 1 3 Validity of the instruction manual 3 1 4 Identification plate 3 1 5 CE label 3 2 Safety 3 2 1 Action in case of emergency 3 2 2 Safety instructions 3 2 3 Regulations 5 2 3 1 Regulations Great Britain and Eire 5 3 Instructions for operation 5 3 1 Manufacturer s guarantee 5 3 2 Intended use 5 3 3 Requirements of the installation site 6 3 4 Care 6 3 5 Recycling and disposal...

Страница 3: ...nation 3 Type approval designation 4 Specification of the unit 1 5 CE label The CE label documents that the appliances as de scribed in the type overview satisfy the basic require ments of the following directives Gas appliances directive 90 396 EEC Electromagnetic compatibility directive with threshold class B 2004 108 EEC Low voltage directive 2006 95 EEC The appliances satisfy the basic require...

Страница 4: ...em Installation and setting The appliance may only be installed by a suitably quali fied heating engineer This person also accepts respon sibility for proper installation and commissioning and also for the observance of the existing rules regulations and directives The engineer is also responsible for inspection mainte nance and repairs to the appliance and alterations to the gas volume setting a ...

Страница 5: ...tions IGE UP 10 Installation of gas appliances in industrial and commercial premises Part 1 Flued appliances 3 Instructions for operation 3 1 Manufacturer s guarantee Vaillant warranty Vaillant provide a full parts and labour warranty for this appliance The appliance must be installed by a suitably competent person in accordance with the Gas Safety Installation and Use Regulations 1998 and the man...

Страница 6: ... temperature can be set individually The correct setting is normally undertaken by the heat ing engineer The required heating and set back phases e g at night are automatically switched on off using integrated timer programs Owing to legal stipulations concerning energy conservation the use of weather compensated controllers and thermostatic valves is specified Reducing the heating system Reduce t...

Страница 7: ...mps only if needed Circulation pumps facilitate the continuous circulation of hot water through the piping system which means that hot water is immediately available also at more distant draw off points These pumps undoubtedly en hance the convenience of the hot water generation process But they also need power And circulating hot water that is not used cools off when passing through pipes and the...

Страница 8: ...will not be limited 9 Rotary knob for setting the storage tank temper ature on units with the VIH domestic hot water cylinder connected When using the VRC 430 for controlling the cylinder temperature set the knob to the clockwise end stop so that the work ing range of the hot water regulator in the VRC 430 will not be restricted Digital Information and Analysis System DIA 11 12 Fig 4 2 ecoCRAFT di...

Страница 9: ...displayed instead of the current flow tem perature for approx 5 seconds The filling pressure must lie between 1 0 and 2 0 bar when the system is cold in order for the heating installa tion to operate properly If the pressure is lower than this the water must be topped up before starting up see Section 4 7 4 hNote When the unit is in operation you can have the exact pressure shown in the display Ac...

Страница 10: ...al actuators After a wait of approx 5s or if the button is pressed the unit s electronics switch to normal operation 4 4 Hot water preparation For hot water preparation a Type VIH domestic hot water cylinder must be connected to the boiler 4 4 1 Setting the hot water temperature 2 3 Fig 4 5 Setting the water temperature Switch on the appliance as described in section 4 3 Specify the storage temper...

Страница 11: ...nd the following settings Left position but not all the way in spring and au tumn Outside temperature approx 10 to 20 C Mid position setting in reasonably cold weather Outside temperature approx 0 to 10 C Right position in very cold weather Outside temperature approx 0 to 15 C When you adjust the temperature the value specified is shown in the display 2 This display disappears after 3 seconds and ...

Страница 12: ...status codes e g S 4 for burner operation The table below ex plains the most important status codes The displayed status code is additionally explained by a complementa ry plain text message on the display of the DIA system e g for S 4 Heating mode burner on In switching phases for example on starting up again after the flame was extinguished the status message S briefly appears Press the i button...

Страница 13: ...tomati cally after 20 seconds If the pressure falls below 0 3 bar the unit shuts off The error message F 22 ap pears in the display To return the unit to normal opera tion the heating engineer must first top up the system with water Below 0 bar i e if the sensor is defective the Vaillant assured comfort mode is activated If the pressure drops frequently the reason for the loss of hot water must be...

Страница 14: ... the cold water shut off valve In this regard please refer to the instructions in Section 4 9 concerning frost protection Note The isolator devices are not included in the scope of delivery for your unit They are fitted by your heating engineer on site He must ex plain to you the position and handling of these components 4 9 Frost protection The heating system and water pipes are sufficiently pro ...

Страница 15: ... pass without any buttons being pressed Screw the cover caps back on to the test openings 4 10 Maintenance and Customer Service 4 10 1 Maintenance Permanent operational readiness and safety reliability and a long service life require inspections and mainte nance work to be carried out annually by a heating en gineer d Danger Danger of property damage and personal injury from improper handling Neve...

Страница 16: ...0020058717_03 GB 052009 Subject to alterations ...

Отзывы: