5 Flat roof fitting and installation
42
Installation manual auroTHERM, auroTHERM plus 0020100571_03
5.3.2
Checking installation
Use the following checklist to ensure that all work steps have been performed.
Note
After initial start-up, and in seasons with significant ambient temperature fluctuations, condensate may form in the
collector. This is normal.
Note
Reflections caused by irregularities of the glass are typical of the material.
Operations
Yes
No
Comments
Building statics taken into account during installation of the
system
☐
☐
Clearances from the roof edge complied with in accord-
ance with the specifications
☐
☐
Rack positioned in accordance with the dimensions spe-
cifications
☐
☐
All bolts securely tightened
(Installation and telescopic rail)
☐
☐
Adequate ballast weights used
(Only for floating installation)
☐
☐
Load weights adequately secured against slipping and
tilting
(Only for floating installation)
☐
☐
Rack anchored and bolts tightened
(Only for direct connection)
☐
☐
All hydraulic connections secured with clamps
☐
☐
Hydraulic connections routed correctly
☐
☐
VR 11
collector sensor connected
☐
☐
Collectors connected to lightning protection device
(Optionally for lightning protection device)
☐
☐
Pressure testing performed
(Ideally with compressed air)
☐
☐
All connections tight
☐
☐
Date
Signature
All installation work has been
performed correctly.
ˍ ˍ
.
ˍ ˍ
.
ˍ ˍ ˍ ˍ