
On-roof fitting and installation 4
0020077994_03 auroTHERM exclusive Installation manual
25
4.3
Completing and checking the installation
4.3.1
Checking installation
Use the following checklist to ensure that all work steps have been performed.
Operations
Yes
No
Comments
All hydraulic connections tightened
☐
☐
Hydraulic connections routed correctly
☐
☐
VR 11
collector sensor connected
(Only for systems WITH a collector sensor)
☐
☐
All clamping elements tightened
☐
☐
Collectors connected to lightning protection device
(Optionally for lightning protection device)
☐
☐
Pressure testing performed
(Ideally with compressed air)
☐
☐
All connections tight
☐
☐
Date
Signature
All installation work has been
performed correctly.
ˍ ˍ
.
ˍ ˍ
.
ˍ ˍ ˍ ˍ