background image

Installation 5

0020221298_04 auroSTOR Installation and maintenance instructions

13

5.3.5

Connecting the solar circuit to the power
supply

70

60 50

40

70

60 50

40

1

3

2

4

1

3

2

4

L

N

2

L

L

N

N

1

2

3

1

Solar collector

2

Pump output

3

Solar pump

Connect the thermal cut-out. To do this, consult the in-
structions for the control or the multi-functional module.

Diameter of the cable: 2.5 mm

²

5.3.6

Electrical connection of the temperature
sensor

Condition

: With a multi-functional module or control

Connect the temperature sensor to the multi-functional
module or the control; to do this, see the instructions for
the control or multi-functional module.

5.3.7

Connecting the control

Condition

: eBUS

The thermal cut-out for the primary circuit is not used when
connecting an eBUS unit.

Condition

: 230 V control

If you use a 230 V control from a third-party manufacturer,
connect the thermal cut-out

(2)

and

(3)

for the primary circuit

with the 2-way motorised valve to isolate the heat source in
the event of a fault in the 2-way motorised valve.

5.3.8

Electric connection for the primary circuit

1.

Connect the thermostat for the primary circuit and the
thermal cut-out.

Diameter of the cable: 2.5 mm

²

Condition

: S plan

1

3

2

4

2

1

3

2

2

4

4

1

8

L

8L

8L

SL

70

60 50

40

8

L

8L

8L

SL

70

60 50

40

1

3

2

4

Establish the connection to the electronics box.

Condition

: Y plan

70

60 50

40

1

3

2

4

2

8

L

8L

8L

SL

1

3

2

2

4

4

1

70

60 50

40

1

3

2

4

Connect the plug

(1)

to the electronics box.

Содержание auroSTOR VIH S GB 200/3 BES

Страница 1: ...lation and maintenance instructions auroSTOR VIH S GB 3 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Страница 2: ...unit horizontally 7 5 2 Hydraulic connection 7 5 3 Electrical installation 11 6 Start up 14 6 1 Setting the immersion heater thermostat 14 6 2 Cold water inlet pressure 14 6 3 Setting the thermostati...

Страница 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Страница 4: ...orrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is t...

Страница 5: ...appropriate Building Regu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are re...

Страница 6: ...tion area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise heat l...

Страница 7: ...and temper ature and pressure relief valve 4 5 Product dimensions 595 638 90 379 317 265 154 B A D C E F Dimensions mm VIH S GB 200 3 BES VIH S GB 250 3 BES VIH S GB 300 3 BES A 1 265 1 535 1 745 B 9...

Страница 8: ...and the outlet 2 Installing the solar yield sensor 2 Install the yield sensor on the solar coil outlet close to the cylinder 5 2 2 Connecting the product to the heating circuit 1 Connect the heating c...

Страница 9: ...tall the expansion vessel close to the product 2 Install a pipe at the expansion vessel and connect the terminal to the safety assembly 6 5 2 6 Installing a discharge pipe 600 mm 300 mm D2 2 1 D1 1 Te...

Страница 10: ...ontact with the waste water and provided that the sys tem is not visible Do not install any valves or stopcocks on the drain pipework Make sure that the discharge pipe from the tundish to the drain ha...

Страница 11: ...and N are live Switch off the power supply Secure the power supply against being switched back on Caution Risk of material damage by drilling through the product The product may be damaged by drilling...

Страница 12: ...pply 70 60 50 40 1 3 2 4 L N 1 L N 3 2 4 1 2 1 Remove the cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards...

Страница 13: ...nctional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V control from...

Страница 14: ...eck the immer sion heater in particular 9 Open the highest hot water supply valve and then the lowest hot water supply valve and let the water flow Water running time 5 min 10 Close all of the draw of...

Страница 15: ...draw off valve 2 Secure a hose to the drain valve 3 Position the hose at a suitable drain 4 Open the highest hot water tap in the installation 5 Open the drain valve and drain the product completely...

Страница 16: ...le 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vesse...

Страница 17: ...16 0 kW 15 2 kW Flow rate 900 l h 900 l h 900 l h Pressure loss in the heat exchanger heating circuit 50 mbar 50 mbar 50 mbar Volume of the heat exchanger heating circuit 3 7 l 3 7 l 3 7 l Volume of...

Страница 18: ...z 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz IP rating 21 21 21 Technical data Material VIH S GB 200 3 BES VIH S GB 250 3 BES VIH S GB 300 3 BES Cylinder mat...

Страница 19: ...Appendix 0020221298_04 auroSTOR Installation and maintenance instructions 19 D Commissioning Checklist...

Страница 20: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Страница 21: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comm...

Страница 22: ...n valve 8 Draining the product 15 E Electricity 3 F Filling and purging the heating circuit 14 Filling and purging the product 14 Filling and purging the solar circuit 14 Frost 4 H Handing over to the...

Страница 23: ......

Страница 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Отзывы: