Gas supply adjustments (Commissioning Part II) 7
Instructions for installation and servicing aquaPLUS VUI 362-7
31
7.8 Fit boiler casing
• Carefully push case (1) onto the boiler such that the
locating points either side at the top of the boiler
engage. Push the casing onto the securing clips at the
bottom of the boiler.
• Close control panel (2).
• Secure control panel by turning both securing
fasteners (3) clockwise by 90°.
• Close front door (4).
• Open the punch-out holes in the cover panel (6) for
the pipework installation.
• Fit the bottom cover (6).
Fig. 7.6: Fit boiler casing
VRC-VC
1
4
2
I
0
90¡
90¡
3
6
Supplied by HeatingSpares247.com