background image

4 General Requirements

Instructions for installation and servicing aquaPLUS VUI 362-7

8

4 General Requirements

4.1 Preliminary remarks

This appliance should only be installed in conjunction
with a Vaillant flue system.

Install the flue system as detailed in the separate flue
installation instructions supplied with this boiler.

4.2 Related Documents

The installation of the boiler must be in accordance with
the relevant requirements of Gas Safety (Installation
and Use) Regulations 1998, Health and Safety Document
No. 635 (The Electricity at Work Regulations 1989),
BS7671 (IEE Wiring Regulations) and the Water Supply
(Water Fittings) Regulations 1999, or the Water Bylaws
2000 (Scotland). It should also be in accordance with
the relevant requirements of the Local Authority,
Building Regulations, Building Regulations (Scotland),
Building Regulations (Northern Ireland) and the relevant
recommendations of the following British Standards,
including current amendments to Approved Documents
Part L and J:

BS 5440: Flues and ventilation of gas fired boilers not
exceeding 70 kW net:

- Part 1: Flues

- Part 2: Ventilation

BS 5449: Specification for forced circulation hot water
for domestic premises.
BS 5546: Specification for gas hot water supplies for
domestic premises.
BS 6700: Services supplying water for domestic use
within buildings and their curtilages.
BS 6798: Specification for installation of gas fired
boilers not exceeding 70 kW input.
BS 6891: Specification for installation of low pressure
gas pipework up to 28 mm (R1) in domestic premises
(2

nd

family gas).

BS 7593: Treatment of water in domestic hot water
central heating systems.
Institute of Gas Engineers Publication IGE/UP/7/1998:
Guide for Installation in Timber Framed Housing.

Benchmark Code of Practice, Building Regulations
Approved Documents Part L 2002, Part J 2002.

4.3 Boiler location

The location chosen for the boiler must permit the
provision of a satisfactory flue termination. The location
must also provide adequate space for servicing and air
circulation around the boiler. The boiler may be installed
in any room, although particular attention is drawn to
the requirements of BS7671 (IEE Regulations) and, in
Scotland, the electrical provisions of the Building
Regulations (Scotland) and in IE the current edition of
IS 813 and the current ETCI rules, in respect of the
installation of a boiler in a room containing a bath or
shower.

Where the installation of the boiler will be in an unusual
location, special procedures may be necessary and BS
5546 and BS 6798 give detailed guidance on this
aspect. The boiler must be mounted on a flat, vertical
wall, which must be sufficiently robust to take the
weight of the boiler. The boiler may be installed on a
combustible wall, subject to the requirements of the
Local Authorities and Building Regulations.
A compartment used to enclose the boiler must be
designed and constructed specifically for this purpose.
(An existing cupboard or compartment may be used
provided that it is modified for the purpose). Details of
essential features of cupboard/compartment design
including airing cupboard installations are given in 
BS 6798.
If the boiler is to be fitted in a timber framed building, it
should be fitted in accordance with Institute of Gas
Engineers Publication IGE/UP/7/1998 "Guide for Gas
Installation in Timber Framed Housing".

4.4 Gas Supply

• The gas supplier should ensure the availability of an

adequate supply of gas.

• A gas meter may only be connected to the service

pipe by the supplier of gas or their contractor.

• An existing meter should be checked to ensure that it

is capable of passing the rate of gas supply required.

• Installation pipes should be fitted in accordance with

BS 6891.

• Pipework from the meter to the boiler must be of an

adequate size. Do not use pipes of a smaller size than
the boiler gas connection (22 mm).

• The complete installation must be tested for

soundness and purged as described in BS 6891.

Important:

The appliance must be installed and

serviced by a competent person as stated in the Gas
Safety (Installation and Use) Regulations 1998. In IE, the
installation must be in accordance with the current
edition of IS 813 'Domestic Gas Installations', the
current Building Regulations and reference should be
made to the current ETCI rules for electrical installation.

Note:

Where a room sealed boiler is installed in a room

containing a bath or shower, any electrical switch or
boiler control utilising mains electricity should be so
situated that it cannot be touched by a person using the
bath or shower.

834702_33GB_012005.qxd  09.03.2005 16:26 Uhr  Seite 8

Содержание aquaPLUS VUI 362-7

Страница 1: ...VUI 362 7 Gas fired room sealed fan assisted combination boiler with integrated 15 litre power store For the installer Instructions for installation and servicing aquaPLUS GB...

Страница 2: ...to the boiler 17 5 11 Electrical installation 18 5 12 Connection to the main supply 18 5 13 Electronic board layout 20 5 14 Controls 21 5 15 Thermostatic radiator valves 22 Page 5 16 Frost protection...

Страница 3: ...ion ring 3 1 Controls cover door 4 1 Lower cover plate packed in bottom packaging 5 1 Cold water inlet valve 6 3 Flow and return service value gas service valve 7 5 Copper tails for gas and water pipe...

Страница 4: ...an be installed with either a horizontal or vertical RSF room sealed fan assisted flue Two types of flue systems are available the standard concentric flue system 100 mm outside diameter and a larger...

Страница 5: ...ssure required natural gas 20 mbar Gas supply G20 Gross CV s t 37 8 MJ m3 Gas burner pressure max rate 11 0 mbar Gas burner pressure ignition rate 1 1 mbar Gas rate max DHW 4 3 m3 h CH temperature flo...

Страница 6: ...y 1 Air duct 2 Fan 3 Power store 4 Main heat exchanger 5 Temperature sensor NTC I 6 Temperature sensor NTC III 7 Diverter valve 8 DHW pressure relief valve 9 Temperature sensor NTC IV 10 DHW heat exch...

Страница 7: ...iler Specification 3 Instructions for installation and servicing aquaPLUS VUI 362 7 7 6 3 8 11 12 9 13 25 14 15 16 17 18 19 20 21 22 23 10 7 26 4 5 1 2 24 27 28 29 30 Fig 3 2 Functional Diagram aquaPL...

Страница 8: ...Scotland the electrical provisions of the Building Regulations Scotland and in IE the current edition of IS 813 and the current ETCI rules in respect of the installation of a boiler in a room containi...

Страница 9: ...flexibility A vertical flue system is also available Art No 303 800 Refer to flue system installation instructions for full details Fig 4 1 Art No 303 807 Fig 4 2 Art No 303 800 48 1285 603 48 750 48...

Страница 10: ...40 1 It is recommended that a fanned flue terminal should be positioned as follows a at least 2 m from an opening in a building directly opposite and b so that the products of combustion are not direc...

Страница 11: ...e or microbore systems Copper tubing to BS 2871 Part 1 should be used for water carrying pipework All capillary joints in all DHW pipework must be made with lead free solder Particularly where a new b...

Страница 12: ...atic radiator valves and no additional by pass is required 4 9 10 Venting The boiler is fitted with an automatic air vent Additional provision should be made to enable the heating system to be vented...

Страница 13: ...openable door etc Fig 5 1 Dimensions of boiler 440 800 497 Note If the boiler is to be fitted in a timber framed building it should be fitted in accordance with Institute of Gas Engineers Publication...

Страница 14: ...it hole Upper hole 2 indicates top outlet flue with flue turret facing rearward Mark the position of the hanging bracket fixing holes 1 Drill 2 holes 10 mm for the hanging bracket Top outlet rear exit...

Страница 15: ...g bracket 1 Lower the boiler slowly onto the hanging bracket so that the slots at the rear of the boiler fully engage onto the hanging bracket 1 1 3 2 Note If the boiler is to be fitted in a timber fr...

Страница 16: ...old water mains inlet and hot water outlet Flush all foreign matter from the mains supply before connecting to the boiler Connect the cold water service valve 1 to the cold inlet water connection 3 of...

Страница 17: ...the nuts Connect the central heating pipework to the flow 9 and return 4 tails Pressure Relief Valves central heating and domestic hot water Connect discharge pipes not less than 15 mm diameter to th...

Страница 18: ...ables 6 8 or 16 3 x 0 75 to 3 x 1 5 mm2 should be used Warning This appliance must be earthed Important Ensure that all cords pass through the cable clamps in the rear of the control box and are secur...

Страница 19: ...r Installation Sequence 5 Instructions for installation and servicing aquaPLUS VUI 362 7 19 Fig 5 9 Exposed rear view of switchgear cabinet Fig 5 10 Wiring system 3 N L 9 8 7 5 4 3 RT 24V 230V RT 230V...

Страница 20: ...for diverter valve Socket X7 for accessory box connection Socket X8 for VRC VC connection Room thermostat 230 V connections 3 4 and 5 Mains power supply connections L N and earth Socket X12 pump conne...

Страница 21: ...TAT PRT11 PRT17 L N 4 L N 3 3 4 1 2 3 4 3 L N 2 3 4 L N 3 4 1 3 4 3 4 5 5 Connection details for external time switches and boiler terminal strip Fig 5 13 shows the connection details where a time swi...

Страница 22: ...RV s are used they are used in conjunction with a programmable room thermostat or separate timer and room thermostat to ensure complete boiler shut down when the heating demand is satisfied The radiat...

Страница 23: ...here is adequate ventilation extinguish all naked flames and do not smoke whilst purging After purging the gas service valve connection must be retightened and tested for soundness The boiler itself d...

Страница 24: ...1 ON position Continue holding button until display alternates between P1 P2 P3 P11 P12 and P13 Release button Press button until P1 full gas rate is shown in display Press i button to operate boiler...

Страница 25: ...trol Press and hold the button while pressing the button turn the main ON OFF control to the 1 ON position Continue holding button until display alternates between P1 P2 P3 P11 P12 and P13 Release but...

Страница 26: ...P3 P11 P12 and P13 Release button Press button until P1 full gas rate is shown in display Press i button to operate boiler at full gas rate Using a 10 mm spanner turn nut 2 to adjust the burner opera...

Страница 27: ...nition rate is shown in display Press i button to operate boiler at full gas rate Use a suitably sized screwdriver to turn the inner screw 2 Turn the screw 2 clockwise to increase the ignation rate Tu...

Страница 28: ...required Identify required range rating setting and note main burner pressure in mbar for that output Turn on the central heating Ensure that any thermostatic radiator valves are open and set to high...

Страница 29: ...crease the value Observe the U gauge as the button is pushed and stop pushing when the required main burner pressure has been achieved 5 After setting press and hold the i button for five seconds or u...

Страница 30: ...ow adjusted by pushing the button until the gauge equals the pressure as detailed in the table below Note The button has no function in this mode if the required pressure is exceeded during set up thi...

Страница 31: ...ting points either side at the top of the boiler engage Push the casing onto the securing clips at the bottom of the boiler Close control panel 2 Secure control panel by turning both securing fastener...

Страница 32: ...r correct operation Fig 8 1 Test for correct functioning I 0 This appliance is fitted with a display unit that uses symbols to show the current operating status of the boiler Additionally to this the...

Страница 33: ...iler and system to reach operating temperature Check that the heating system is watertight Turn the boiler off and rapidly drain both boiler and system while still hot Refill the system and release al...

Страница 34: ...ing a hot water tap Inspect the burner operation through the viewing window Check that the flames are evenly covering the surface of the burner Inspect for signs of excessive flame lift or sooting 8 F...

Страница 35: ...vessel charge point Check that the internal charge pressure of expansion vessel is between 0 7 0 9 bar If pressure is lower than this the vessel should be re pressurised using an air pump Refit valve...

Страница 36: ...rect burner operation normal flame or lock out crossed out flame Instructions for installation and servicing aquaPLUS VUI 362 7 36 Fig 10 1 Display indications 10 2 Logical fault finding procedure The...

Страница 37: ...is not showing in the boiler display follow the fault finding charts referring also to the status mode table 3 Note If the boiler display is completely blank initially check the two fuses Isolate the...

Страница 38: ...S 26 Fan over run store charging S 27 Pump over run store charging S 28 Anti cycling mode store charging S 30 No heating demand from external controls S 31 Summer mode heating control knob in off pos...

Страница 39: ...tment values d 00 Part load setting 0 30 d 01 Water pump over run 1 2 3 60 min factory adjusted to 5 min d 02 Maximum burner anti cycling period at 20 C 8 60 min factory adjusted to 15 min flow temper...

Страница 40: ...pted 2nd ignitions d 71 Maximum target value for heating system flow 0 82 C 1 87 C factory adjustment 82 C temperature d 72 Pump over run time after filling hot water store 0 1 2 250 s factory adjustm...

Страница 41: ...eeded F 22 Dry fire protection No water in appliance pump cable defective pump blocked or defective pump output too low F 23 Dry fire protection difference between flow and No water in appliance pump...

Страница 42: ...VDC present between 5V and GND test points on electronic board Replace LCD display Yes No Repair external fault Is the continuity across fuse F1 Go to sheet B Does ON OFF knob operate switch on elect...

Страница 43: ...display on the LCD panel Check transformer 230 VAC primary black red and approx 17 VDC secondary blue brown Check replace pump Replace fuse F1 If fan commences operation exchange gas valve After appro...

Страница 44: ...fitted is calling for heat Check diagnostic code D 08 see page 39 Is heating demand present No Is 230 VAC present across terminals 4 and 5 No External fault Check all external controls are calling fo...

Страница 45: ...637 Check 4 pin connector for fan speed control Does the fan run now Is 230 VAC present across fan terminals Replace electronic board Yes No No Yes No Yes Yes Check replace fan Does the boiler commenc...

Страница 46: ...No Check replace gas valve as necessary Does burner light No Replace electronic board Yes Is burner indicator illuminated No Check flame rectification lead and electrode Is burner indicator illuminat...

Страница 47: ...flow and return service valves are open No No No Replace electronic board No Check operation of boiler in DHW mode does flame increase in size to full rate Yes Check partial load setting No Check diag...

Страница 48: ...ly open and adjustment is at maximum flow rate Does green warmstart indicator flash now Check Clear impeller in Aquasensor replace if necessary Check replace hall sensor Replace electronic board Does...

Страница 49: ...icator Hot water demand indicator Ignition indicator MAIN SWITCHBOARD IGNITION ELECTRODES Legend b blue br brown y g yellow green r red p pink or orange t transparent bl black gr grey w white gr b br...

Страница 50: ...7 8 9 10 11 X2 Aqua sensor NTC air pressure switch NTC tank earth ionisation electrode NTC coding resistor flow NTC return lifting magnet 24 23 1 12 13 14 15 16 17 18 19 20 21 22 2 3 4 5 6 7 8 9 10 1...

Страница 51: ...tank NTC 252 805 Fig 10 6 Warmstart NTC Main heat exchanger 065 087 Fig 10 7 Expansion vessel 10 l 181 079 Fig 10 8 heating Switch and control board 130 821 Fig 10 9 Main transformer 287 450 Fig 10 1...

Страница 52: ...12 Short parts list 52 Instructions for installation and servicing aquaPLUS VUI 362 7 Fig 10 1 Fig 10 2 Fig 10 3 Fig 10 5 Fig 10 6 Fig 10 7 Fig 10 8 Fig 10 9 Fig 10 10 Fig 10 11 Fig 10 12 Fig 10 13...

Страница 53: ...allation and servicing aquaPLUS VUI 362 7 Fig 10 14 Fig 10 15 Fig 10 16 Fig 10 17 Fig 10 18 Fig 10 19 Fig 10 20 Fig 10 22 For these components please observe the associated installation and removal in...

Страница 54: ......

Страница 55: ......

Страница 56: ......

Страница 57: ......

Страница 58: ......

Страница 59: ......

Страница 60: ...834702_34 GB 03 2005 Subject to alteration...

Отзывы: