background image

4

2 Safety

Instructions for use VUI 362-7

4

Attention!
The device may only be used 
• for initial operation

• for testing
• for continuous operation
with the chamber cover closed and with the flue
system fully mounted and sealed.

2.2 General precautions

2.2.1 Corrosion protection

DO NOT use aerosol sprays, solvents, chlorine-based
cleaning products, paints, adhesives, etc. in the vicinity
of the unit. The use of these items can, under certain
circumstances, also result in corrosion damage to the
flue outlet system.

2 Safety

2.1 Safety instructions 

2.1.1 Setup and adjustments 

Installation and adjustment of the boiler as well as
service maintenance and repair of the boiler may only
be carried out by a competent person in accordance
with the Gas Safety (Installation and Use) Regulations
1998. (In the U.K. "CORGI" Registered installers
undertake the work to a safe and satisfactory standard).
If the boiler is installed in a compartment do not
obstruct any purpose provided ventilation openings, and
do not use the compartment for storage purposes.

2.1.2 Gas smell

If you smell gas or suspect a gas leak:

• Turn off the boiler
• Do not switch the light or any electrical switches in

the hazardous area on or off, do not use the telephone
in the hazardous area, avoid sparking, such as lighting
the lighter or matches

• Do not smoke in the hazardous area
• Turn off the gas supply at the gas meter 
• Ventilate the room 
• Warn the other occupants and leave the house
• Consult your gas supplier, service agent or other

competent person.

2.1.3 Modifications in and around the boiler

No modifications may be made to the following items: 

• The boiler
• The gas, water and electrical supply
• The flue system 
• The safety valve for the heating water 
• Any structural changes around the appliance that

could affect the operational safety of the boiler.

2.1.4 Explosive and flammable materials

Do not use or store any explosive or highly flammable
materials (e.g. gasoline, paper or paint) near to the
appliance.

2.1.5 Inspection

The boiler should be serviced annually. We recommend
that you sign a service agreement with your service
agent or Vaillant Ltd.

Important!

When tightening or slackening screwed connec-
tions always use suitable open-ended spanners
(not pipe wrench, or extensions, etc.).
Incorrect use and/or unsuitable tools can lead to 
damage being caused (e.g. gas or water leakage)!

834641_12GB_032005.qxd  09.03.2005 16:42 Uhr  Seite 4

Содержание aquaPLUS VUI 362-7

Страница 1: ...VUI 362 7 For the user GB Instructions for use aquaPLUS Gas fired room sealed fan assisted combination boiler with 15L store...

Страница 2: ...n the service valves 6 3 2 2 Check the water contents 6 3 3 Domestic hot water operation 6 3 3 1 Warmstart operation 7 3 3 2 Obtaining hot water 7 3 4 Heating operation 8 3 4 1 Setting the maximum rad...

Страница 3: ...Both should be recorded in the Benchmark gas boiler commissioning checklist You can check your installer by calling CORGI direct on 01256 372300 01256 372300 1 4 EC designation The purpose of EC desi...

Страница 4: ...or suspect a gas leak Turn off the boiler Do not switch the light or any electrical switches in the hazardous area on or off do not use the telephone in the hazardous area avoid sparking such as ligh...

Страница 5: ...g 50 C or Displaying of a status error code 8 Correct burner operation normal flame or lock out crossed out flame Fig 3 2 Display indications 0 I C o C o VRC VC 1 2 3 7 6 5 4 8 3 Operation 3 1 Overwie...

Страница 6: ...et the control knob above the mid 12 o clock position to prevent excessive scale formation fig 3 5 VRC VC C o 0 I C o 1 3 2 Initial checks before turning ON 3 2 1 Open the service valves Ensure the co...

Страница 7: ...play Reset the hot water temperature control knob to the desired setting Note Irrespective of whether the warmstart facility is switched on or off the boiler will automatically operate to provide hot...

Страница 8: ...nd fan will continue to operate for a short period to fully disperse the heat from the boiler Note The boiler incorporates an anti cycling economiser control to prevent energy wasteful ON and OFF oper...

Страница 9: ...inguished during operation A new attempt to ignite the flame can then only be performed after pressing the Reset button Press the Reset button 2 and hold for approx 1 second Warning If the boiler stil...

Страница 10: ...e VRC VC C o 0 I C o C o C o C o 1 Fig 3 12 Reset 3 6 1 Faults in the hot water system To protect the storage vessel feed pump the appliance is equipped with dry running protection This prevents opera...

Страница 11: ...VC C o 0 I C o C o C o I 0 2 If the boiler is not operated for several hours during very cold weather there is therefore the possibility of the system freezing Please ensure that if you are absent dur...

Страница 12: ...834641_12GB 03 2005 Subject to alteration...

Отзывы: