2
CONTENTS: PART 1 CONCENTRIC 60/100
Requirements
Planning the air/flue duct layout
4
Alternative termination accessories available
5
Maximum flue lengths Ø 60/100
9
Flue restrictor rings
10
Preparation
11
Top outlet flue exiting to rear
11
Top outlet flue exiting to side
11
Preparation
14
Preparation of boiler for rear outlet air/flue duct
16
Installation of the horizontal
air/flue duct (top outlet)
Fitting air/flue duct extensions
Page
§
25
Fitting air/flue duct extensions
between two 90° elbows
26
Fitting air/flue duct extensions
between two 45° elbows
27
Installing the air/flue duct sliding
sleeve
28
Installation of the vertical
roof duct
Installation of the horizontal
air/flue duct (rear outlet)
Preparation
19
Top outlet flue exiting to rear
19
Top outlet flue exiting to side
19
Preparation
22
Pitched roof
23
Flat roof
23
Pitched and flat roof installation
23
Installation of the Se-Duct flue