background image

5 Installation

8

Installation and maintenance instructions uniSTOR 0020235301_03

Reference
point

Description

E

500 mm (on a switching system)

Provide sufficient clearance

(B)

on at least one side of

the product in order to facilitate access for maintenance
and repair work.

When using the accessories, observe the minimum clear-
ances/installation clearances.

5

Installation

5.1

Installing the product

Align the product horizontally.

5.2

Hydraulic connection

Caution.
Risk of damage caused by heat transfer
when welding.

The heat that is transferred during welding
may damage the cylinder and its components
as well as the connection seals.

Protect the product and its components.

Do not weld the connection pieces if these
have been screwed into the pipe fittings.

Caution.
Risk of material damage by drilling
through the product.

The product may be damaged by drilling
work.

Do not drill through the product.

Caution.
Risk of material damage to the cylinder.

If an unvented hot water cylinder is fitted at
a high level (eg, loft space), potential dam-
age to the cylinder may occur if the correct
method of draining is not followed.

In certain circumstances and at the dis-
cretion of the installer, install a WRAS ap-
proved automatic air vent on the hot water
outlet at the highest point.

1

2

3

4

5

7

6

8

9

10

11

15

13

12

16

17

14

18

20

22

19

21

1

Cylinder draining point

2

Drain valve system
(Not included in the
scope of delivery for the
product)

3

Expansion vessel
(Available as an ac-
cessory)

4

Tundish

5

Safety group
(Available as an ac-
cessory)

6

Cold water with equal
pressure

7

Second safety as-
sembly, supplied with
additional manometer
(Available as an ac-
cessory)

8

Fixed lifting eye
Manual air vent behind
it

9

Optional connection
method

3-port motor-

ised valve
(Not included in the
scope of delivery for the
product)

10

Heating circuit heating
flow

11

Heat generator heating
flow

12

Cylinder heating inlet

13

Hot water outlet

14

Boiler connection
method

2-port

motorised valve
(Not included in the
scope of delivery for the
product)

15

Temperature and pres-
sure expansion relief
valve

16

Secondary circulation
(Not included in the
scope of delivery for the
product)

17

Temperature sensor

18

Cylinder heating return

19

Cylinder solar inlet

20

Solar temperature
sensor

21

Cylinder solar return

22

Cold water inlet

5.2.1

Connecting the solar circuit

1.

Connect the solar circuit to the inlet

(19)

and the outlet

(21)

.

Installing the solar yield sensor

2.

Install the yield sensor on the solar coil outlet close to
the cylinder.

Содержание 0010019234

Страница 1: ...ation and maintenance instructions uniSTOR VIH S GB 500 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Страница 2: ...stallation 8 5 1 Installing the product 8 5 2 Hydraulic connection 8 5 3 Electrical installation 12 6 Start up 15 6 1 Setting the immersion heater thermostat 15 6 2 Cold water inlet pressure 15 6 3 Se...

Страница 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Страница 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Страница 5: ...e Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out installation com...

Страница 6: ...llation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise hea...

Страница 7: ...5 Check that the scope of delivery is complete Le gend point Quant ity Description 1 1 Expansion vessel 2 1 Tundish with retainer 3 1 Safety group 4 1 Documentation records 5 1 Domestic hot water cyli...

Страница 8: ...dis cretion of the installer install a WRAS ap proved automatic air vent on the hot water outlet at the highest point 1 2 3 4 5 7 6 8 9 10 11 15 13 12 16 17 14 18 20 22 19 21 1 Cylinder draining poin...

Страница 9: ...head so that it is facing upwards 5 2 3 Installing the drain valve The drain valve must be supplied by the customer Install the drain valve at the height of the cold water supply or further below this...

Страница 10: ...pipe D1 Minimum diameter of the dis charge pipe from the tun dish D2 Maximum permiss ible res istance inform ation on the length of a straight pipe Resist ance per elbow or bend 1 2 15 mm 22 mm 28 mm...

Страница 11: ...ability of prams being under the drain opening The resistance of the surface to hot water The possibility of ice forming if water drains onto access paths 5 2 7 Installing the cylinder s temperature s...

Страница 12: ...the product 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 70 60 50 40 1 3 2 4 1 2 3 4 3 5 1 Immersion heater 2 Immersion heater ther mostat 3 Retainer for the temper ature sensor 4 Primary circuit thermo st...

Страница 13: ...ectrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater con nection Cable di...

Страница 14: ...multi functional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V cont...

Страница 15: ...et the maximum value 6 4 Filling and purging the product Note It is not permitted to use valves or expansion relief valves for the purging 1 Check whether the drain valve is closed 2 Open the domestic...

Страница 16: ...k page of these instructions If you require spare parts for maintenance or repair work use only the spare parts that are permitted for the product 9 Inspection and maintenance 9 1 Observing inspection...

Страница 17: ...ion and maintenance instructions 17 11 Customer service To ensure regular servicing it is strongly recommended that arrangements are made for a Maintenance Agreement Please contact Vaillant Service So...

Страница 18: ...ng 3 Thermostat set too high 4 Defective thermostat 1 Install a mixer tap 2 Repair the cable 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water ou...

Страница 19: ...eating output solar circuit 19 2 kW Flow rate 900 l h Pressure loss in the heat exchanger heating circuit 10 mbar Volume of the heat exchanger heating circuit 23 l Volume of the heat exchanger solar c...

Страница 20: ...SW GB 500 BES 3 way motorised valve 230 240 V 50Hz Thermostat 230 240 V 50Hz IP rating 21 Technical data Material VIH SW GB 500 BES Cylinder material Stainless steel 1 4521 Insulation material Glass...

Страница 21: ...Appendix 0020235301_03 uniSTOR Installation and maintenance instructions 21 D Commissioning Checklist...

Страница 22: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Страница 23: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Страница 24: ...product 16 E Electricity 3 F Filling and purging the heating circuit 15 Filling and purging the product 15 Filling and purging the solar circuit 16 Frost 4 H Handing over to the end user 16 I Identifi...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Отзывы: