background image

Appendix

22

Installation and maintenance instructions uniSTOR 0020235301_03

This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of 
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.

MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST

Customer name:

Telephone number:

Address:

Cylinder Make and Model

Cylinder Serial Number

Commissioned by (PRINT NAME):

Registered Operative ID Number

Company name:

Telephone number:

Company address:

Commissioning date:

7REHFRPSOHWHGE\WKHFXVWRPHURQUHFHLSWRID%XLOGLQJ5HJXODWLRQV&RPSOLDQFH&HUWL¿FDWH

%XLOGLQJ5HJXODWLRQV1RWL¿FDWLRQ1XPEHULIDSSOLFDEOH

ALL SYSTEMS PRIMARY SETTINGS 

(indirect heating only)

Is the primary circuit a sealed or open vented system?

Sealed

Open

:KDWLVWKHPD[LPXPSULPDU\ÀRZWHPSHUDWXUH"

°C

ALL SYSTEMS

What is the incoming static cold water pressure at the inlet to the system?

bar

+DVDVWUDLQHUEHHQFOHDQHGRILQVWDOODWLRQGHEULVLI¿WWHG"

Yes

No

Is the installation in a hard water area (above 200ppm)?

Yes

No

,I\HVKDVDZDWHUVFDOHUHGXFHUEHHQ¿WWHG"

Yes

No

:KDWW\SHRIVFDOHUHGXFHUKDVEHHQ¿WWHG"

What is the hot water thermostat set temperature?

°C

:KDWLVWKHPD[LPXPKRWZDWHUÀRZUDWHDWVHWWKHUPRVWDWWHPSHUDWXUHPHDVXUHGDWKLJKÀRZRXWOHW"

I/min

7LPHDQGWHPSHUDWXUHFRQWUROVKDYHEHHQ¿WWHGLQFRPSOLDQFHZLWK3DUW/RIWKH%XLOGLQJ5HJXODWLRQV"

Yes

Type of control system (if applicable)

Y Plan

S Plan

Other

Is the cylinder solar (or other renewable) compatible?

Yes

No

What is the hot water temperature at the nearest outlet?

°C

All appropriate pipes have been insulated up to 1 metre or the point where they become concealed

Yes

UNVENTED SYSTEMS ONLY

:KHUHLVWKHSUHVVXUHUHGXFLQJYDOYHVLWXDWHGLI¿WWHG"

What is the pressure reducing valve setting?

bar

+DVDFRPELQHGWHPSHUDWXUHDQGSUHVVXUHUHOLHIYDOYHDQGH[SDQVLRQYDOYHEHHQ¿WWHGDQGGLVFKDUJHWHVWHG"

Yes

No

The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations

Yes

$UHDOOHQHUJ\VRXUFHV¿WWHGZLWKDFXWRXWGHYLFH"

Yes

No

Has the expansion vessel or internal air space been checked?

Yes

No

THERMAL STORES ONLY

What store temperature is achievable?

°C

What is the maximum hot water temperature?

°C

ALL INSTALLATIONS

The hot water system complies with the appropriate Building Regulations

Yes

The system has been installed and commissioned in accordance with the manufacturer’s instructions

Yes

The system controls have been demonstrated to and understood by the customer

Yes

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer

Yes

Commissioning Engineer’s Signature

Customer’s Signature

7RFRQ¿UPVDWLVIDFWRU\GHPRQVWUDWLRQDQGUHFHLSWRIPDQXIDFWXUHU¶VOLWHUDWXUH

$OOLQVWDOODWLRQVLQ(QJODQGDQG:DOHVPXVWEHQRWL¿HGWR/RFDO$XWKRULW\%XLOGLQJ&RQWURO/$%&HLWKHUGLUHFWO\RUWKURXJKD

&RPSHWHQW3HUVRQV6FKHPH$%XLOGLQJ5HJXODWLRQV&RPSOLDQFH&HUWL¿FDWHZLOOWKHQEHLVVXHGWRWKHFXVWRPHU

© Heating and Hotwater Industry Council (HHIC)

www.centralheating.co.uk

Содержание 0010019234

Страница 1: ...ation and maintenance instructions uniSTOR VIH S GB 500 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Страница 2: ...stallation 8 5 1 Installing the product 8 5 2 Hydraulic connection 8 5 3 Electrical installation 12 6 Start up 15 6 1 Setting the immersion heater thermostat 15 6 2 Cold water inlet pressure 15 6 3 Se...

Страница 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Страница 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Страница 5: ...e Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out installation com...

Страница 6: ...llation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise hea...

Страница 7: ...5 Check that the scope of delivery is complete Le gend point Quant ity Description 1 1 Expansion vessel 2 1 Tundish with retainer 3 1 Safety group 4 1 Documentation records 5 1 Domestic hot water cyli...

Страница 8: ...dis cretion of the installer install a WRAS ap proved automatic air vent on the hot water outlet at the highest point 1 2 3 4 5 7 6 8 9 10 11 15 13 12 16 17 14 18 20 22 19 21 1 Cylinder draining poin...

Страница 9: ...head so that it is facing upwards 5 2 3 Installing the drain valve The drain valve must be supplied by the customer Install the drain valve at the height of the cold water supply or further below this...

Страница 10: ...pipe D1 Minimum diameter of the dis charge pipe from the tun dish D2 Maximum permiss ible res istance inform ation on the length of a straight pipe Resist ance per elbow or bend 1 2 15 mm 22 mm 28 mm...

Страница 11: ...ability of prams being under the drain opening The resistance of the surface to hot water The possibility of ice forming if water drains onto access paths 5 2 7 Installing the cylinder s temperature s...

Страница 12: ...the product 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 70 60 50 40 1 3 2 4 1 2 3 4 3 5 1 Immersion heater 2 Immersion heater ther mostat 3 Retainer for the temper ature sensor 4 Primary circuit thermo st...

Страница 13: ...ectrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater con nection Cable di...

Страница 14: ...multi functional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V cont...

Страница 15: ...et the maximum value 6 4 Filling and purging the product Note It is not permitted to use valves or expansion relief valves for the purging 1 Check whether the drain valve is closed 2 Open the domestic...

Страница 16: ...k page of these instructions If you require spare parts for maintenance or repair work use only the spare parts that are permitted for the product 9 Inspection and maintenance 9 1 Observing inspection...

Страница 17: ...ion and maintenance instructions 17 11 Customer service To ensure regular servicing it is strongly recommended that arrangements are made for a Maintenance Agreement Please contact Vaillant Service So...

Страница 18: ...ng 3 Thermostat set too high 4 Defective thermostat 1 Install a mixer tap 2 Repair the cable 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water ou...

Страница 19: ...eating output solar circuit 19 2 kW Flow rate 900 l h Pressure loss in the heat exchanger heating circuit 10 mbar Volume of the heat exchanger heating circuit 23 l Volume of the heat exchanger solar c...

Страница 20: ...SW GB 500 BES 3 way motorised valve 230 240 V 50Hz Thermostat 230 240 V 50Hz IP rating 21 Technical data Material VIH SW GB 500 BES Cylinder material Stainless steel 1 4521 Insulation material Glass...

Страница 21: ...Appendix 0020235301_03 uniSTOR Installation and maintenance instructions 21 D Commissioning Checklist...

Страница 22: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Страница 23: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Страница 24: ...product 16 E Electricity 3 F Filling and purging the heating circuit 15 Filling and purging the product 15 Filling and purging the solar circuit 16 Frost 4 H Handing over to the end user 16 I Identifi...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Отзывы: