Installation
4
5
Installation
Before installing your new mixer, flush
through the pipework to ensure removal
of debris, turn off the water supply.
Warning!
Please check for any
hidden cables and pipes before drilling
holes.
Position the seat and mark the 3 fixing
holes, remove the seat and drill the 3 x
12mm holes to the required depth.
Insert the expansion bolts into the holes.
Slide the seat over the studs followed
by the 3 washers and nuts. Use the
adjusting screws to level the seat, when
satisfied with the level finally tighten
down the bolts.
Connect the inlet pipes to the seat with
the hot on the left and cold on the right.
Nut
Washer
Seat
Bolts
Adjusting
screw
Bolts
Hot inlet
Cold inlet
Seat
Front
Finish the floor covering down to a
diameter of 78mm.
Remove the 2 screws and pull out
the safety cover.
Insert the main body assembly into
the seat, tighten the fastening plate,
and cover with the escutcheon.
Seat
78mm
Safety
cover
Screws
Seat
Escutcheon
Fastening
plate
Floor