VADO CAMEO CAM-F1200 Скачать руководство пользователя страница 7

12

13

CAM-HANK handle

Find the centre of the draw and drill a 

starter hole through the front face using 

2.5mm drill bit. Drill again using a 5mm 

drill bit.  

Attach the handle using the longer 

(40mm) screw provided.

Note: 

Make sure your drill is set at 

exactly 90 degrees to the door’s surface.

CAM-HAN12L & CAM-HAN12R handles

Line up the handle on the drawer 

making sure the edges are flush with the 

top of the drawer, mark the holes.

Drill pilot holes  and screw on the handle 

using the screws provided.

CAM-HANB handle 

Find the centre of the draw and line up 

the handle horizontally, mark the screw 

points and drill a starter holes through 

each mark on the front face using 

2.5mm drill bit. Drill again using a 5mm 

drill bit.  

Attach the handle using the longer 

(40mm) screws provided. 

Note: 

Make sure your drill is set at 

exactly 90 degrees to the door’s surface.

The coating on this product is finished to the highest standard. Due care needs to be 

taken to ensure the appearance is retained.  

We recommend cleaning all products with a soft damp cloth ONLY and advise strongly 

against the use of all aggressive/corrosive cleaning products i.e. powders and liquids. If 

these instructions are not followed, this may invalidate your guarantee in the event of a 

problem occurring.

      Note:

 Bathroom furniture will deteriorate through extended exposure to elevated 

levels of condensation. To mitigate this, it is imperative that bathrooms are equipped 

with an appropriate ventilation system, such as an extractor fan.

Each draw has a weight limit of 20kg.

2.5mm drill

2.5mm drill

5mm drill

5mm drill

For illustration purposes only 

the drawer front is shown

For illustration purposes only 

the drawer front is shown

Middle of unit

Содержание CAMEO CAM-F1200

Страница 1: ...Unit CAM F1200 Vado Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 aftersales vado com www vado com This instruction booklet covers these models CAM F1200 All finish...

Страница 2: ...nd safety guidelines It is recommended that 2 people carry out the installation of larger basin vanity units over 30Kgs gross weight Check for any hidden pipes or electrical cables before drilling hol...

Страница 3: ...are not fitted level this may prevent the basin from draining correctly Decide on the position and height of the unit The recommended basin height is between 800 and 900mm from floor to top of basin M...

Страница 4: ...hangers to clamp the unit to the wall With two people lift the unit over and onto the brackets make sure that the that both latches are over the brackets before releasing the unit Bracket Latch Use th...

Страница 5: ...a non acidic silicone along the top edge of the unit and carefully position the countertop ensuring that it is flush with the sides of the vanity unit Fix basin by applying silicone on the outer edge...

Страница 6: ...nto the runners until you hear a click to secure the drawers Repeat the same procedure for the top drawer Locator Tab Apply silicone non acidic to the side and front edges of the unit Carefully positi...

Страница 7: ...r 40mm screws provided Note Make sure your drill is set at exactly 90 degrees to the door s surface The coating on this product is finished to the highest standard Due care needs to be taken to ensure...

Страница 8: ...rrosion are not covered under this guarantee This guarantee does not cover damage and or malfunction caused by inappropriate cleaning please refer to our recommended care and maintenance guidelines Da...

Отзывы: