background image

6

7

Installation

Before installing your new mixer, flush 

through the pipe work to ensure removal 

of debris, turn off the water supply.
Ensure the O-ring is in place in the 

bottom of the mixer body.
Position the mixer on the basin. From 

the underside of the basin screw the 

two flexible pipes to the hot and cold 

connections in the mixer body, the hot 

should be to the left and the cold to the 

right, hand tighten only. 
Screw the threaded rods into the small 

hole inside the mixer body.
Slide the rubber and metal washer over 

the rod, the rubber washer should be 

on top. Screw on the nuts and tighten to 

clamp the mixer to the basin.  

CAUTION:

 Do not over tighten the nuts as 

this may damage the basin.
Connect the water supply to the inlet 

pipes. The hot water should be connected 

to the left pipe and cold to the right.

CAUTION:

 When 

installing the 

flexible hoses 

do 

not

 kink, or bend  

them more than the 

60mm diameter as 

shown right.

60mm

Installation - Quick guide

 

4

 

5

 

3

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

Control 

handle

O-ring

Rubber 

washer
Metal 

washer

Nuts

Hot flexible  

pipe (red)

Cold flexible  

pipe (blue)

Threaded 

rods

Содержание AXCES AX-MAT-110-CP

Страница 1: ...N USER MANUAL This instruction booklet covers model AX MAT 110 CP Version 1 1 9 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com MATRIX MONO BIDET MIXER WITH POP UP WASTE ...

Страница 2: ...ulations 1999 and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could re...

Страница 3: ...122mm 45mm 100mm 1 2 Dimensions Installation Quick guide 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 5 2 6 3 60mm ...

Страница 4: ...ixer body Slide the rubber and metal washer over the rod the rubber washer should be on top Screw on the nuts and tighten to clamp the mixer to the basin CAUTION Do not over tighten the nuts as this may damage the basin Connect the water supply to the inlet pipes The hot water should be connected to the left pipe and cold to the right CAUTION When installing the flexible hoses do not kink or bend ...

Страница 5: ... and loosely tighten Test the action of the pop up waste and fully tighten the rod link Adjust the ball joint retainer and control rod link as required Turn on the water supply and turn the mixer on fully to flush through any possible debris from the mixer Finally check all new connections for leaks Lifting the mixer lever upwards will increase the flow of water Moving the mixer lever from right t...

Страница 6: ...sed agents or damage caused by foreign objects or substances The extended guarantee is only available if you have completed the Guarantee Registration Process This can be done via the VADO website or via phone to our aftersales team Registration must be completed within 6 months from date of purchase Under the extended guarantee period VADO will at its option offer to supply any replacement produc...

Отзывы: