Instructions and settings
24
01.03.2014 2
5
Fasten the pin (C) as in
”Figure 1.22”
.
Figure 1.22 Drawbar in position 1, for drilling oilseed.
6
Remove or fold down all the spill prevention plates between the StripDrill tines. To set the spill
prevention plates, see
”1.9.5 Setting the spill prevention plates” on page 20
.
7
Remove the cover from the seed distributor head. Close every other hole on the seed distributor head
by inserting plugs into the holes for all long seed drill units.
8
Replace the cover.
9
Adjust the bout marker arms according to the section
“Bout markers”
in the Instructions.
For the machine to be centred for transport the drawbar must be in position 2, see
”Figure 1.17”
and
” Switching from drilling oilseed to drilling grain and transport” on page 21
.
C
Содержание Spirit StripDrill ST 600C Series
Страница 2: ...V derstad Verken AB V derstad Sweden 2014...
Страница 4: ...4 01 03 2014 2...
Страница 34: ...Appendices 34 01 03 2014 2 3 5 Hydraulics for ST 400C 3 5 1 Overview of hydraulic system Figure 3 1 492552 Q S...
Страница 37: ......