Edge Equipment Enclosures
. Edge Equipment Enclosures - Document Number 342-0026 Rev. A
Page 8 of 12
5)
Installation of Door Pulls and Hinges
a. Hinges: Peel the blue protective film off both sides of the doors. Peel and stick the small
strike plate from the hinge package to the top inside corner of the door as shown. The long
edge of the door is the height. Peel and stick the small metal strike plate to the bottom inside
corner of the door.
b. Door Pulls/Handles: Take foam pad from handle package and apply it to the opposite corner
of the strike plate.
c. For the 2
nd
door: Repeat steps a & b, making sure to apply the strike plates, foam pad and
handle on the opposite sides to create a pair of doors.
6)
Installing the Rack Rails for the Rack Enclosure Models:
Before putting on the doors, fasten the
rack rail and spacer block to the enclosure with the 1-¼” drywall screw. Slide the screw through the
predrilled hole and turn it into the location holes on both sides of the enclosure.
**For the EE-Shelf Enclosure, put the shelf pins in the predrilled shelf pin holes and mount the shelf at the desired height.
Height Edge of Door
Door Hinge
Package
Foam Pad
Door Pull
Package
Strike
Plates
Foam Pad
Door Pull
Location hole for screw to fasten rack
rail and filler block to enclosure
Flush edge of
rack rail and
spacer block