18
VADA FLOW BOSS
SUBMERSIBLE PUMP
VFB-S35
INSTALLATION MANUAL
2. Where possible, install the VFB-DSU using
the wall mount bracket.
3. Connect the pump discharge pipe to the
port labelled ‘pump’ on the VFB-DSU.
Ensure that the submersible pump is raised
off the base of the tank, and a y-strainer
is installed prior to the VFB-DSU. Brace
the VFB-DSU to prevent movement while
connecting to all inlets/outlets.
Note:
Pipe size should be in accordance with
pump outlet size – reduction may be required
immediately prior to entering the VFB-DSU.
4. Connect the mains pipework into the port
labelled ‘mains’ on the VFB-DSU.
INSTALLATION
25mm
Y Strainer
25mm
Barrel union
Flow
House wall
Ground level
Min 100mm
Mains
House wall
25mm
Y Strainer
25mm
Barrel union
Flow
House wall
Ground level
Household
Min 100mm
Mains
Cable
tie
25mm
Check valve
25mm Isolation valve
VFB-S35
Discharge pipe min 25mm
25mm
Y Strainer
25mm
Barrel union
Flow
House wall
Ground level
5. Connect the household pipework into the port labelled ‘outlet’ on the VFB-DSU.
Содержание VFB-S35
Страница 1: ...SUBMERSIBLE PUMP INSTALLATION MANUAL VFB S35...
Страница 44: ......