14
VADA FLOW BOSS
SUBMERSIBLE PUMP
VFB-S35
INSTALLATION MANUAL
PART 2: DISCHARGE SET UP
Now that your sump pump is positioned,
it’s time to set up the discharge pipework.
1. Create space for your discharge pipeline
at the top of your tank. Ensure the
space allows for the minimum pipe size
(internal 25mm).
2. Remove pump from tank to connect
discharge pipework. Once connected place
the pump and pipework back into the tank.
3. Fit a check valve to the discharge pipework.
The check valve will prevent fluid from
draining when the pump has stopped.
4. For easy maintenance install an isolation
valve to the discharge line outside of
the tank.
Note:
When lifting or raising in and out of
position, use the handle or your choice of rope.
Do not lift via the power cable.
4. Check the set up so far. The surface
the pump sits on should be hard and there
should be enough clearance between
the base of the tank and suction inlet
(approx 50–100mm). This clearance helps
prevent sediment and debris from entering
the pump.
INSTALLATION
50–100mm
Discharge pipe min 25mm
25mm
Check valve
25mm Isolation valve
Discharge pipe min 25mm