4. Check the set up so far. Ensure that the
VFB-APC is braced or fixed so minimal
movement occurs once in operation. If the
distance between the pump and highest
outlet exceeds 15m, adjust the cut-in
pressure on the VFB-APC.
25mm Y Strainer
25mm Barrel union
Solid base
10
0m
m
Flow
Isolation
valve
2. Position the Auto Pressure Control
(VFB-APC) between the pump and the first
outlet.
Note:
If you are installing the VFB-APC directly
onto the Horizontal Multistage Pump, use a
25mm barrel union. If you are installing the
VFB-APC between the pump and first outlet,
use pipework with a minimum internal diameter
of 25mm.
Note:
Do not install an outlet between the
pump and VFB-APC.
Note:
the pipe must have an internal diameter
no smaller than 25mm until the first tee branch.
3. Ensure the VFB-APC is installed with the
arrows pointing up.
Solid base level