Cleaning and maintenance
76
20901118_EN-US_PC301x VARIO select Serie_V1.3_100720
23. Secure the controller on
the pumping unit and con-
nect all cables.
24. Plug in the power plug.
If maintenance work has been completed in full:
ð
Connect the hoses for operation.
ð
Connect the pumping unit to the power supply.
R
Pumping unit is ready to be returned to use.
R
Without reconnection -> Pumping unit is prepared for
storage.