background image

page 20 of 36

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. manual-no.: 99 90 20 / 01/12/2004

Basic setup Management or Management 

Plus

Starting and stopping the process control, venting the system and the operation modes two-point control
and continuous pumping are described in section ”basic setup Standard”.
If the cooling water valve is preselected, the cooling water valve opens immediately after starting the
process control (the cooling water valve 24 V= at the controller is operated parallel (synchronous) to the
cooling water valve at the VMS Module A), the according symbol is displayed.

Basic setup Management:

The vacuum pump is switched off when the process control is stopped.
Attention: If working in basic setup Management without an isolation valve, air might enter the apparatus
through the pump when it is switched off, especially if the gas ballast valve is open.

Basic setup Management 

Plus:

The vacuum pump continuous to run for approx. 5 min. when process control is stopped to remove remaining
condensate if necessary, symbol pump is flashing.

Only basic setup Management:

If the pump is switched frequently the warning triangle is
flashing.

Check system parameters, especially the selected value
for  

p.

Example basic setup

 Management 

Plus

: PC 510 connected to a rotary evaporator

coolant

coolant

electrical circuit

vacuum connection

Содержание CVC 2

Страница 1: ...buted completely and unchanged It is strictly the users responsibility to check carefully the validity of this document with respect to his product manual no 99 90 20 01 12 2004 Vacuum controller CVC 2II Technology for Vacuum Systems Instructions for use ...

Страница 2: ...ontroller VACUUBRAND controllers are the result of many years of experience in construction and practical operation of these controllers combined with the latest developments in material and manufacturing technology Our quality maxim is the zero fault principle Every controller leaving our company is tested intensively including an endurance run Therefore also faults which occur rarely are identif...

Страница 3: ...Contents Safety information 4 Technical data 6 Description 7 General view basic setups 9 How to work with the controller 10 General view basic setup Standard 11 Basic setup Standard 12 Vacuum management with VMS Module A 16 Basic setup Management or Management Plus 20 General view basic setup VACUU LAN 22 Basic setup VACUU LAN 23 How to determine the best distillation conditions 26 Installation an...

Страница 4: ... connected only to a suitable fused and protected electrical supply and a suitable earth point Failure to connect the device to ground may result in deadly electrical shock The supply cable may be fitted with a moulded European IEC plug or a plug suitable for your local electrical supply If the plug has been removed or has to be removed the cable will contain wires colour coded as follows green or...

Страница 5: ...failure Operating the isolation or cooling water valve or the pump in combination withVMS Module A must not lead to a critical dangerous situation under any circumstances Use only genuine spare parts and accessories Otherwise safety and performance of the equipment as well as the electromagnetic compatibility of the equipment might be reduced Ensure that maintenance is done only by suitably traine...

Страница 6: ... r e p t r o h s r o f n o i t a r e p o e g n a r e r u t a r e p m e t t n e i b m A C 0 4 o t C 0 e g a r o t s e g n a r e r u t a r e p m e t t n e i b m A C 0 7 o t C 0 1 e t a l p g n i t a r e e s y l p p u s s n i a M z H 0 6 0 5 5 1 V 0 1 1 z H 0 6 0 5 0 1 V 0 3 2 9 2 5 C E I n o i t c e t o r p f o e e r g e D 0 2 P I w a r d r e w o P A V 3 1 x a m r o f d e t a n g i s e d r o t c e n...

Страница 7: ... basic setup The status of the controller respectively of the connected accessories is displayed by corresponding symbols on the LCD After switching on the controller the version of the software is displayed then the preselected basic setup The solenoid operated isolation valve is switched if connected automatic identification the cooling water valve is switched if the valve is configurated Pressu...

Страница 8: ... to connect valves and vacuum management system VMS Module A useY socket plug connector if necessary VENT START STOP MODE p p start or stop of process control confirmation of selected values switching between two switch point control and continuous pumping special function in combination with an additional key setting of set point p switching in programs rating plate vacuum connection air admittan...

Страница 9: ...d factory set controller switches solenoid operated isolation valve indispensable cooling water valve optional basic setup Management controller switches pump solenoid operated isolation valve if connected cooling water valve optional basic setup VACUU LAN controller switches pump according to preset pressure and time values solenoid operated isolation valve if connected only in combination withVa...

Страница 10: ...e pressure units are displayed the pressure unit as from last operation is flashing Press key p or p to change pressure unit Press key START STOP to confirm and to finish the operation mode Setting the cooling water valve optional The controller switches a preselected cooling water valve A cooling water valve has to be configurated at the controller before starting the process see section Changing...

Страница 11: ...view basic setup Standard configurate cooling water valve setting the operation mode semiautomatic determination of the boiling point switching to two point control actual pressure is stored as new set point manual setting set point boiling point and hysteresis pumping down to ulti mate vacuum of the pump setting the basic setup basic setup Standard yes no continuous pumping two point control proc...

Страница 12: ...etup After switching on Starting and stopping the process control In both modes two point control and continuous vacuum To start the process control Press key START STOP If the cooling water valve is preselected Cooling water valve opens immediately the symbol is displayed Isolation valve opens If a cooling water valve is preselected at the first demand of vacuum the isolation valve opens 2 sec pa...

Страница 13: ...rol display disappears MODE Start Press key START STOP Arrow down and valve and or pump symbol are flashing Stop Press key START STOP Selecting the set point by using keys p or p Set mode is activated by pressing key shortly Set p ap pears Short tips toggle p in steps of 1 mbar Continuous pressing activates ramp set point p changes with increasing speed Changing set point p leads at the same time ...

Страница 14: ...hortly the current pressure is displayed for one second Continuous pressing or a second tip within one second The isolation valve is opened pump is switched on the current pressure is displayed and stored as new set point when the key is released Hysteresis p is adapted automatically only in case of great set point changes Hysteresis p can be manually changed at any time Changing the set point p u...

Страница 15: ...nchanged It is strictly the users responsibility to check carefully the validity of this document with respect to his product manual no 99 90 20 01 12 2004 Example basic setup Standard PC 510 connected to a rotary evaporator coolant coolant electrical circuit vacuum connection ...

Страница 16: ...ACUU LAN and choosing an operation mode two point control or continuous pumping The con nected components of the chemistry vacuum system have to be preset once only The vacuum controller CVC 2II offers four basic setups depending on the components of the VACUUBRAND chemistry vacuum system which are con nected to the system the specific user and or process requirements The controller CVC 2II identi...

Страница 17: ...i w s n o i t a l o s i d n a e v l a v _ _ _ A e l u d o M S M V A e l u d o M S M V Î Î Î d r a d n a t S t n e m e g a n a M t n e m e g a n m a M s u l P m e t s y s r e s u e l p i t l u m N A L U U C A V h t i w 1 1 5 C P 0 1 5 C P 0 1 6 C P 0 2 5 C P 0 2 6 C P 1 1 6 C P Î e h t t a l o r t n o c p m u p e h t g n i h c t i w s e v l a v n o i t a l o s i y l n o p m u p e h t g n i h c t i ...

Страница 18: ...equirements Process orientated switching of the diaphragm pump in two point control operation and in continuous operation High tolerance to condensates due to sufficient operation time even in interval operation Management A VMS Module A is indispensable Process orientated switching of the diaphragm pump in two point control operation and in continuous operation Dispenses the cooling water accordi...

Страница 19: ...ctivate yes or to inactivate no the cooling water valve and press key START STOP to con firm The cooling water valve 24 V at the controller is operated parallel synchronous to the cooling water valve at the VMS Module A The controller is now ready for operation process control inactive The isolation valve is identified automatically If it is missing in basic setup Standard or Management Plus the p...

Страница 20: ...ynchronous to the cooling water valve at the VMS Module A the according symbol is displayed Basic setup Management The vacuum pump is switched off when the process control is stopped Attention If working in basic setup Management without an isolation valve air might enter the apparatus through the pump when it is switched off especially if the gas ballast valve is open Basic setup Management Plus ...

Страница 21: ...the validity of this document with respect to his product manual no 99 90 20 01 12 2004 coolant Example basic setup Management MZ 2C AK EK without isolation valve Example basic setup Management MZ 2C AK EK VACUU LAN components with isolation valves coolant electrical circuit vacuum connection coolant electrical circuit vacuum connection coolant ...

Страница 22: ...valve setting process parameters pressure value condition for automatic shut down upper set point condition for restart time for automatic shut down setting the basic setup basic setup VACUU LAN yes no switching cooling water valve start pump down The pump and the cooling water valve if applicable is switched off if the pressure is below the lower pressure value longer than the time for automatic ...

Страница 23: ... valve if applicable is switched off if the pressure is below the lower pressure value longer than the time for automatic shut down The pump starts automatically if the pressure is higher than the upper set point To stop process control After time for automatic shut down or pressing key START STOP the process control is stopped The pump is switched off If a cooling water valve is preselected Cooli...

Страница 24: ...ontinuous pressing Set the lower set point by pressing key p or p The lower pressure value is stored as the new set point when the key is released Note Choose the pressure value in a range which is achieved in the vacuum system if there is no more gas or vapour genera tion at the vacuum connections It is recommended to select a pressure value which is approx 10 mbar higher than the ultimate pressu...

Страница 25: ... the users responsibility to check carefully the validity of this document with respect to his product manual no 99 90 20 01 12 2004 Example basic setup VACUU LAN PC 510 VACUU LAN components with isolation valve ball valve or flow control diaphragm coolant coolant electrical circuit vacuum connection ...

Страница 26: ...he isolation valve approx not more than two operations per minute List of solvents Appropriate selection of p Choose p in a range from 5 mbar high boiling solvents e g water toluene to 150 mbar low boiling solvents e g methanol dichloromethane Note Changing set point p while process control is stopped leads at the same time to automatic preselection of p During process control hysteresis is adapte...

Страница 27: ... system quickly and cost efficient to specific requirements thanks to its modular concept Vacuum generation Chemistry diaphragm pump MD 4C 230 V 50 60 Hz 3 0 m3 h 2 mbar 69 62 92 Chemistry diaphragm MZ 2C 230V 50 60 Hz 1 7 m3 h 9 mbar 69 62 41 Pump support kit for installation of the diaphragm pump in vertical position space saving avoiding accumulation of condensate in the pump Pump support MD 4C...

Страница 28: ...rinciple for work stations for one or multiple users Standby for coolant and vacuum Cooling water valve 230V 50 60 Hz 67 60 10 for use with the VMS Y socket plug connector 67 60 15 to connect several components to the bush of the CVC 2II e g for simultaneous operation of isolation valve and VMS Accessories of controller Solenoid operated isolation valve VV 6C 24 V 67 40 91 PVDF PTFE small flange N...

Страница 29: ...g n a h c d e r i u q e r e h t n i a t t a n a c r e h g i h a s a h r o m u u c a v k c e h c d e e p s g n i p m u p f o h t g n e l d n a r e t e m a i d d n a p m u p n e e w t e b e n i l e p i p m e t s y s d e y a l p s i d s i l o b m y s e v l a V s n i a m e r e v l a v n o i t a l o s i d e s o l c Î l a c i r t c e l e r o l a c i n a h c e M n o i t a l o s i e h t f o e g a m a d e ...

Страница 30: ... t o t e c i v e d e h t n r u t e R r i a p e r r o f y r o t c a f k r o w t o n s e o d p m u P Î d e t c e n n o c p m u p d n a e v l a V e d o m n o i t a r e p o S M V o t d r a d n a t S n o i t a r e p o r e h t o n a e s o o h C p m u p t c e n n o c r o e d o m y l p p u s s n i a m o t y l t c e r i d Î p m u p d e t c e n n o c S M V d e y a l p s i d t o n s i l o b m y s p u t e s c...

Страница 31: ...ude between e g airport and laboratory Adjustment under vacuum Evacuate the controller to a pressure 0 5 mbar e g by apply ing a good rotary vane pump Press key p or p simultaneous with key MODE the con troller then switches to the adjustment mode CAL is displayed for approx 2 seconds While CAL is displayed press key START STOP The reading is automatically adjusted to zero Press key STOP to confir...

Страница 32: ...chnical authority of the Federal Republic of Germany for the field of meteorology and certain sectors of safety engineering for the measurable variable pressure in the pressure range from 10 3 mbar to 1000 mbar in accordance with the general criteria for the operation of testing laboratories defined in the DIN EN ISO IEC 17025 2000 series of standards Calibration in theVACUUBRAND calibration labor...

Страница 33: ...very product returned for repair We submit quotations only on request and always at the customer s expense If an order is given the costs incurred are offset from the costs for repair or from the pur chase price if the customer prefers to buy a new product instead of repairing the defective one If you do not wish a repair on the basis of our quotation the equipment might be returned to you disasse...

Страница 34: ...s We assure for the returned product that neither toxic corrosive biologically active explosive radio active nor contamination dangerous in any way has occurred the product is free of dangerous substances the oil or residues of pumped media have been drained 4 2 for dangerous goods We assure for the returned product that all substances toxic corrosive biologically active explo sive radioactive or ...

Страница 35: ...greement of the manufacturer Par la présente nous déclarons que le dispositif désigné ci dessus est conforme aux prescriptions de base des directives EU applicables et indiqués en ci que concerne conception dessin et modèle vendu par nous mêmes Cette déclaration cesse d être valable si des modifications sont apportées au dispositif sans notre autorisation préalable Niederspannungsrichtlinie Low Vo...

Страница 36: ...results obtained under test conditions for specific applications depend on a number of factors beyond our control It is therefore strictly the users responsibility to very carefully check the validity of application to their specific requirements No claims arising from the information provided in this literature will consequently be entertained VACUUBRAND GMBH CO KG Technology forVacuum Systems 20...

Отзывы: