
5 • vacon
EN: Vacon 100 main switch
en
9
MR4:
Lead the data cable
“D” under the main
switch and attach it.
MR5-MR7
: Lead the data
cable to the terminal
around the main switch
Note 1!
Protect the data
cable as close to the ter-
minal as possible with
the cable insulation tube!
Note 2!
See detailed
cable installation
instructions in the Vacon
100 installation manual!
10
The data cable installa-
tion in MR4 seen from
above.
11
Close the cover of the
drive
M
S
D
M
S
D
2T1
4T2
6T3
1L1
3L2
5L3