• Accesories only together with the inverter shipment are recommanded here.Other wise
may result in a risk of fire, electric shock, or injury to person.
• Make sure that existing wiring is in good condition and that wire is not undersized.
• Do not disassemble any parts of inverter which are not mentioned in installation guide.
It contains no user-serviceable parts. See Warranty for instructions on obtaining service.
• Attempting to service the inverter yourself may result in a risk of electric shock or fire
and will void your warranty.
• Keep away from flammable, explosive materials to avoid fire disaster. The installation
place should be away from humid or corrosive substance.
• Authorized service personnel must use insulated tools when installing or working with
this equipment. PV modules shall have an IEC 61730 class A rating.
• Never touch either the positive or negative pole of PV connecting device. Strictly
prohibit touching both of them at the same time.
• The unit contains capacitors that remain charged to a potentially lethal voltage after the
MAINS , battery and PV supply has been disconnected.
Hazardous voltage will present for up to 5 minutes after disconnection from power
supply.
• CAUTION-RISK of electric shock from energy stored in capacitor, Never operate on the
inverter couplers, the MAINS cables, Battery cables, PV cables or the PV generator when
power is applied. After switching o ffthe PV , battery and Mains, always wait for 5minutes
to let the intermediate circuit capacitors discharge before unpluging DC , battery inplug
and MAINS couplers.
• When accessing the internal circuit of inverter, it is very important to wait 5 minutes
before operating the power circuit or demounting the electrolyte capacitors inside the
device. Do not open the device before hand since the capacitors require time sufficiently
discharge!
INTRODUCTION
The inverter can be used to optimize self consumption, store in the battery for future use
or feedin to public grid. Work mode depends on PV energy and user’s preference. It can
provide power for emergency use during the grid lost by using the energy from battery
and inverter (generated from PV).In addition, the parallel function is available
(off grid model).
System Diagram 1 (applies to most countires )
PV1+
PV1 -
Inverter
PV2+
PV2 -
Megarevo meter
Main switch CT
PE
+
-
Battery
RCD
RCD
DPDT
E-BAR
EPS
Load
Содержание VT-6605103
Страница 19: ...Instructions for the use of three modes ...